Cochin Shipyard Limited
- AOC value
- ₹1.55Cr
- AOC date
- 16 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 16 Feb 25AOC date
- -Published
- -Closes
- -Bid opens
- 16 Feb 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 16/02/2025
- Authority
- Cochin Shipyard Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Cochin Shipyard Limited has published Tender For Fcbt Jobs In Navy Vessel Rm0807; 1 FCBT (Feed Condensate and Booster Pump) - FCBT 1(SERVICE COST) 2 (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. 3 (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing. 4 (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. 5 (d) Repair/ renewal of sentinel valve followed by setting and hot trials. 6 (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. 7 (f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. 8 (g) Overhauling of HP drain 3-way valve view not holding. 9 (h) Tuning and setting to work of PDR to achieve automatic and remote operation. 10 (i) Gland packing renewal and tightening of feed pump and condensate pump. 11 (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. 12 (k) Operationalization of axial float mechanism of turbine. 13 (l) Renewal of cooling manifold including diamond flange followed by application of putty. 14 (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. 15 (n) Operationalization of FCBT RPM indicator. 16 (o) Hot SDCs of the FCBT pump to be proved. 17 (p) Ultrasonic thickness gauging of Turbine Casing. 18 FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3(SERVICE COST) 19 (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required. 20 (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. 21 (c) Repair/ renewal of sentinel valve followed by setting and hot trials. 22 (d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04. 23 (e) Overhauling of HP drain 3-way valve view not holding. 24 (f) Tuning and setting to work of PDR to achieve automatic and remote operation. 25 (g) Gland packing renewal and tightening of feed pump and condensate pump. 26 (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. 27 (i) Renewal of cooling manifold including diamond flange followed by application of putty. 28 (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. 29 (k) Operationalization of FCBT RPM indicator. 30 (l) Hot SDCs of the FCBT pump to be proved. 31 FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (SERVICE COST) 32 (a) High vibrationsobservedduringoperation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary. 33 (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. 34 (c) Repair/ renewal of sentinel valve followed by setting and hot trials. 35 (d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. 36 (e) Overhauling of HP drain 3-way valve view not holding. 37 (f) Tuning and setting to work of PDR to achieve automatic and remote operation. 38 (g) Gland packing renewal and tightening of feed pump and condensate pump. 39 (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. 40 (i) Renewal of cooling manifold including diamond flange followed by application of putty. 41 (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. 42 (k) Operationalization of FCBT RPM indicator. 43 (l) Hot SDCs of the FCBT pump to be proved. 44 FCBT (Feed Condensate and Booster Pump) - FCBT 5 (SERVICE COST) 45 (a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required. 46 (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. 47 (c) Repair renewal of sentinel valve followed by setting and hot trials. 48 (d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04. 49 (e) Overhauling of HP drain 3-way valve view not holding. 50 (f) Tuning and setting to work of PDR to achieve automatic and remote operation. 51 (g) Gland packing renewal and tightening of feed pump and condensate pump. 52 (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. 53 (i) Renewal of cooling manifold including diamond flange followed by application of putty. 54 (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. 55 (k) Operationalization of FCBT RPM indicator. 56 (l) Hot SDCs of the FCBT pump to be proved. 57 FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (SERVICE COST) 58 (a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. 59 (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing. 60 (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. 61 (d) Repair/ renewal of sentinel valve followed by setting and hot trials. 62 (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. 63 (f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04. 64 (g) Overhauling of HP drain 3-way valve view not holding. 65 (h) Tuning and setting to work of PDR to achieve automatic and remote operation. 66 (i) Gland packing renewal and tightening of feed pump and condensate pump. 67 (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. 68 (k) Operationalization of axial float mechanism of turbine. 69 (l) Renewal of cooling manifold including diamond flange followed by application of putty. 70 (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. 71 (n) Operationalization of FCBT RPM indicator. 72 (o) Hot SDCs of the FCBT pump to be proved. 73 (p) Ultrasonic thickness gauging of Turbine Casing. 74 Hot Lagging & Cladding (SERVICE COST) 75 1. 42. 5 Cladding over Steam auxiliary machineries1.42.5.3 FCBT 76 Boilers and TD Auxiliaries (SERVICE COST) 77 1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs) 78 FCBT (Feed Condensate and Booster Pump) - FCBT 1(MATERIAL COST) 79 (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. 80 (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FCBT casing/ Manufacturing of FCBT turning tool as per casing. 81 (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. 82 (d) Repair/ renewal of sentinel valve followed by setting and hot trials. 83 (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. 84 (f) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. 85 (g) Overhauling of HP drain 3-way valve view not holding. 86 (h) Tuning and setting to work of PDR to achieve automatic and remote operation. 87 (i) Gland packing renewal and tightening of feed pump and condensate pump. 88 (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. 89 (k) Operationalization of axial float mechanism of turbine. 90 (l) Renewal of cooling manifold including diamond flange followed by application of putty. 91 (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. 92 (n) Operationalization of FCBT RPM indicator. 93 (o) Hot SDCs of the FCBT pump to be proved. 94 (p) Ultrasonic thickness gauging of Turbine Casing. 95 FCBT (Feed Condensate and Booster Pump) - FCBT 2 & 3(MATERIAL COST) 96 (a) Inspection of Feed pump and condensate pump PTFE bearing along with pencil fitters, renew if required. 97 (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. 98 (c) Repair/ renewal of sentinel valve followed by setting and hot trials. 99 (d) Renewal of working water filter body, change over filter mechanism and elements. QTY –04. 100 (e) Overhauling of HP drain 3-way valve view not holding. 101 (f) Tuning and setting to work of PDR to achieve automatic and remote operation. 102 (g) Gland packing renewal and tightening of feed pump and condensate pump. 103 (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. 104 (i) Renewal of cooling manifold including diamond flange followed by application of putty. 105 (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. 106 (k) Operationalization of FCBT RPM indicator. 107 (l) Hot SDCs of the FCBT pump to be proved. 108 FCBT (Feed Condensate and Booster Pump) - FCBT 4 & 6 (MATERIAL COST) 109 (a) High vibrationsobservedduringoperation . Under inspection FCBT pumps and Box assembly, overhauling/ renew as necessary. 110 (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. 111 (c) Repair/ renewal of sentinel valve followed by setting and hot trials. 112 (d) Renewal of working water filter body, change over filter mechanism and elements. QTY- 04. 113 (e) Overhauling of HP drain 3-way valve view not holding. 114 (f) Tuning and setting to work of PDR to achieve automatic and remote operation. 115 (g) Gland packing renewal and tightening of feed pump and condensate pump. 116 (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. 117 (i) Renewal of cooling manifold including diamond flange followed by application of putty. 118 (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. 119 (k) Operationalization of FCBT RPM indicator. 120 (l) Hot SDCs of the FCBT pump to be proved. 121 FCBT (Feed Condensate and Booster Pump) - FCBT 5 (MATERIAL COST) 122 (a) Inspection of Feed pump and condensate pump PTFE being along with pencil filters Renew if required. 123 (b) Overhauling of regulating wheel along with auto/ manual change over mechanism. 124 (c) Repair renewal of sentinel valve followed by setting and hot trials. 125 (d) Renewal of working water filter body, change over filter mechanism and elements. QTY-04. 126 (e) Overhauling of HP drain 3-way valve view not holding. 127 (f) Tuning and setting to work of PDR to achieve automatic and remote operation. 128 (g) Gland packing renewal and tightening of feed pump and condensate pump. 129 (h) Overhauling of manipulators inclusive of electrical backplane and securing cover. 130 (i) Renewal of cooling manifold including diamond flange followed by application of putty. 131 (j) Overhauling of mechanical control elements inclusive of PDR unit, booster relay. Protection and regulation block, lock up relay. 132 (k) Operationalization of FCBT RPM indicator. 133 (l) Hot SDCs of the FCBT pump to be proved. 134 FCBT (Feed Condensate and Booster Pump) - FCBT 7 & 8 (MATERIAL COST) 135 (a)Inspection of Feed pump and condensate pump PTFE bearing along with pencil filters, renew if required. 136 (b) Misalignment in FCBT hand turning tool slot observed, adjustment of FC8T casing / Manufacturing of FCBT turning tool as per casing. 137 (c) Overhauling of regulating wheel along with auto/ manual change over mechanism. 138 (d) Repair/ renewal of sentinel valve followed by setting and hot trials. 139 (e) High vibration observed on condensate pump top, inspection of bearing and overhauling of pump if required. 140 (f) Renewal of working water filter body, change over fitter mechanism and elements. QTY – 04. 141 (g) Overhauling of HP drain 3-way valve view not holding. 142 (h) Tuning and setting to work of PDR to achieve automatic and remote operation. 143 (i) Gland packing renewal and tightening of feed pump and condensate pump. 144 (j) Overhauling of manipulators inclusive of electrical backplane and securing cover. 145 (k) Operationalization of axial float mechanism of turbine. 146 (l) Renewal of cooling manifold including diamond flange followed by application of putty. 147 (m) Overhauling of mechanical control elements inclusive of PDR unit, booster relay, Protection and regulation block, lock up relay. 148 (n) Operationalization of FCBT RPM indicator. 149 (o) Hot SDCs of the FCBT pump to be proved. 150 (p) Ultrasonic thickness gauging of Turbine Casing. 151 Hot Lagging & Cladding (MATERIAL COST) 152 1. 42. 5 Cladding over Steam auxiliary machineries1.42.5.3 FCBT 153 Boilers and TD Auxiliaries (MATERIAL COST) 154 1.102 Repair of Outer Insulation materials and Cement lagging TD Auxilliaries (FCBTs) . Last date of submission for this tender is 2025-01-06. This is a Commercial Marine Vehicle tender in karwar, Kerala
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free