South Western Railway
Important Info
AOC Description
South Western Railway has published Supply Of Standard Recovery Rectifier Diode With Maximum Continuous Forward Current 300A & Peak Reverse Repetitive Voltage 400V To Vishay Pt.No.300U40a Or Rs Stock No.: 395-3014 Or As Energi Part No. Asds300u40a Or Fully Equivalent.Standard Recovery Rectifier Diode With Maximum Continuous Forward Current 300A & Peak Reverse Repetitive Voltage 400V To Vishay Pt.No.300U40a Or Rs Stock No.: 395-3014 Or As Energi Part No. Asds300u40a Or Fully Equivalent.,Standard Recovery Rectifier Diode With Maximum Continuous Forward Current 300A & Peak Reverse Repetitive Voltage 400V To Vishay Pt.No.300U40a Or Rs Stock No.: 395-3014 Or As Energi Part No. Asds300u40a Or Fully Equivalent. [ Warranty Period: 30 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2025-12-16. This is a Power Diodes tender in Hubbali, Karnataka
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

