South Western Railway
- AOC value
- ₹31.53L
- AOC date
- 21 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 21 Aug 23AOC date
- -Published
- -Closes
- -Bid opens
- 21 Aug 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 21/08/2023
- Authority
- South Western Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
South Western Railway has published Supply, Installation Testing And Commissioning Of Integrated Power Supply ( Ips ) System Smps Based Up To 6 Lines In Re Area Confirming To Rdso Specification No. Rdso / Spn / 165 / 2012 Version 3.0 With Latest Amendment And Configuration As Enclosed Annexure-A & B, List Of Spares Enclosed Annexure-C. Including Power Supply Module For Axle Counter ( Bpac ) , Data Logger And With El Module. Ips Should Be Supplied With 60 Nos Of 2V-200Ah Lmla Battery, Along With 16 Sq.Mm Cable For Ips Battery 20 Mtrs, Asm Panel : 50 Mtrs And Data Logger 50 Mtrs Required, Firm Will Commission The Same With Minimum One Month Prior Notice Period [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation Testing And Commissioning Of Integrated Power Supply ( Ips ) System Smps Based Up To 6 Lines In Re Area Confirming To Rdso Specification No. Rdso / Spn / 165 / 2012 Version 3.0 With Latest Amendment And Configuration As Enclosed Annexure-A & B, List Of Spares Enclosed Annexure-C. Including Power Supply Module For Axle Counter ( Bpac ) , Data Logger And With El Module. Ips Should Be Supplied With 60 Nos Of 2V-200Ah Lmla Battery, Along With 16 Sq.Mm Cable For Ips Battery 20 Mtrs, Asm Panel : 50 Mtrs And Data Logger 50 Mtrs Required, Firm Will Commission The Same With Minimum One Month Prior Notice Period [ Warranty Period: 30 Months After The Date Of Delivery ] . Last date of submission for this tender is 2023-07-04. This is a Dry Cell Batteries tender in Bangalore, Karnataka
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free