Rail Wheel Factory
Important Info
AOC Description
Rail Wheel Factory has published Supply Of Dual Thyristor Modulesdual Thyristor Modules,Dual Thyristor Modules With Common Cathode Having Amplifying Gate Configuration With Thes E Specifications .Capacity Of Average On State Current ‰¥ 570A, Repetitive Peak Off-State Voltage ‰¥1600V& Non-Repetitive Surge Current (A)= 15.5Ka. Gate Requirement: Gate Trigger Current, Igt: ‰¤ 300 Ma & Compa Tible With Industrial Thyristor Firing Circuits. Module Similar(Module Shall Be Electrically And Mechanically Int Erchangeable With Semikron Skkt 570/16 E) To Skkt 570/ 16 E Of Semikron Make. The Bidder Shall Upload The Detailed Datasheet Of The Offered Product Along With The Offer. A Manufacturer?S Test Report (Mtr) / Ma Nufacturer?S Certificate Of Conformance (Coc) Confirming Compliance With The Submitted Datasheet Shall B E Provided At The Time Of Supply. The Certificate Shall Clearly Mention And Be Traceable To The Correspondin G Purchase Order Number [ Warranty Period: 12 Months After The Date Of Delivery ] ] , Dual Thyristor Modules With Common Cathode Having Amplifying Gate Configuration With Thes E Specifications .Capacity Of Average On State Current ‰¥ 309A, Repetitive Peak Off-State Voltage ‰¥1600V, & Non-Repetitive Surge Current (A)‰¥ 8000A. Gate Requirement: Gate Trigger Current, Igt: ‰¤ 300 Ma & Compat Ible With Industrial Thyristor Firing Circuits. Module Similar(Module Shall Be Electrically And Mechanically Inte Rchangeable With Semikron Skkt 330/ 16 E) Similar To Skkt 330/ 16 E Of Semikron Make. The Bidder Shall U Pload The Detailed Datasheet Of The Offered Product Along With The Offer. A Manufacturers Test Report (Mtr ) / Manufacturers Certificate Of Conformance (Coc) Confirming Compliance With The Submitted Datasheet Sh All Be Provided At The Time Of Supply. The Certificate Shall Clearly Mention And Be Traceable To The Correspo Nding Purchase Order Number [ Warranty Period: 12 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2026-01-12. This is a Thyristors tender in Bangalore, Karnataka
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

