Rail Wheel Factory has published Supply Of Cnc Vertical Turning Lathecnc Vertical Turning Lathe,Design, Manufacture, Supply And Installation Of Cnc Vertical Turning Lathe As P Er Rwf Technical Specification No.Rwf/M/M&P/2023-24/Vtl/Wfps, Rev-1 And Amendment-I To Specification Enclosed. ] , Concomitant Accessories As Per Clause 2.2 Of Attached Amendment-1 To Rwf Spe Cification No.Rwf/M/M&P/2023-24/Vtl/Wfps, Rev-1. ] , Comprehensive Annual Maintenance Contract For A Period Of Five (5) Years Post Warranty As Per Clause 15.0 Of Specification. Warranty Period Is 24 Months From The Date O F Commissioning And Proving Out Of M&P. [ Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % ] ] Sse Wheel Final Processing Karnataka 1.00 Numbers At (Location) Shop, Rwf 4 659024770022 Essential Non Stock --- Yes Consignee Inr Services (Y) Preventive Maintenance For Two Years Warranty As Per Clause 14.3 Of Attached Amendment-1 To Rwf Specification No.Rwf/M/M&P/2023-24/Vtl/Wfps,Rev-1. ] Sse Wheel Final Processing Karnataka 1.00 Numbers At (Location) Shop, Rwf Page 1 Of 16 Run Date/Time: 16/05/2025 13:34:28Stores/Rwf Tender Document Tender No P2245864 Closing Date/Time 18/06/2025 14:00 5 659024770023 Essential Non Stock --- Yes Consignee Inr Services (Y) Cost Of Foundation, Installation, Commissioning And Proving Tests Charges On Turnkey Basis As Per Clause 11.0 Of Specification. ] Sse Wheel Final Processing Karnataka 1.00 Numbers At (Location) Shop, Rwf 3. T And C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate Of Supply For All Items Completion : Within 11 Months Supply, Installation, Commissioning And Proving Test Shall Be Completed Within 11 Months. Refer Delivery Schedule Chart As Per Annexure-H Of Specification. Payment Terms S.No Description Payment Terms 1 Payment Terms: (A) 80% Payment On Proof Of Inspection Certiï¬Cate And Rail/Road Challan To Be Made Within 30 Days Of Receipt Of Documents As Speciï¬Ed. (B) Balance 20% Payment Within 90 Days After Sati. Last date of submission for this tender is 2025-06-18. This is a Lathe Machine tender in Bangalore, Karnataka
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |