Rail Wheel Factory
Important Info
AOC Description
Rail Wheel Factory has published Supply Of oil level with dipstick assly , oil level with dipstick to kion part no:mh40939h26 for te use of 3 ton kion-volt as forklift. 1) warranty/guarantee period shall be for a period of minimum 6 months from t he date of fitment or 9 months from the date of supply whichever is early against quality manufacturing defects and workmanship for the item supplied. 2) authorization from oem i s to be enclosed along with the offer, 3) offers are to quote both make and model number/ part number with out which the offers will be summararily rejected. [ warranty period: 9 mo nths after the date of delivery ] ]. Last date of submission for this tender is 2026-03-30. This is a Oils Supply tender in Bangalore, Karnataka
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

