Rail Wheel Factory
Important Info
AOC Description
Rail Wheel Factory has published Supply Of Male Nipple, Nipple Reducer , Straight Male Nipple, Tee Fitting (Four Items)Male Nipple, Nipple Reducer , Straight Male Nipple, Tee Fitting (Four Items),M.S. Reducer Male Nipple To Size 3/4 Inch Male Threads At One End And 1/2 Inch Ma Le Threads At Other End Conforming To Is-1239. [ Warranty Period: 30 Months After The Date Of De Livery ] ] , M.S Straight Nipple Reducer To Size:- 1/2 Inch Bsp Male Threads At One End And O Ther End 1/4 Inch Bsp Male Threads Conforming To Is 1239. [ Warranty Period: 30 Months After Th E Date Of Delivery ] ] , Heavy Duty Ms Straight Male Threaded Nipple To Size 3/4 Bsp At Both Ends Conforming To Is 1 239 [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Heavy Duty M.S. Tee Fitting 3/4 Inch Female Bsp Thread Conforming To Is-1239. [ W Arranty Period: 30 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2026-02-26. This is a Threads tender in Bangalore, Karnataka
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

