Rail Wheel Factory
- AOC value
- ₹82.6K
- AOC date
- 23 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 23 Oct 25AOC date
- -Published
- -Closes
- -Bid opens
- 23 Oct 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 23/10/2025
- Authority
- Rail Wheel Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Wheel Factory has published Supply Of Single Phase, 50/60 Hz. (2 Items)Single Phase, 50/60 Hz. (2 Items),Single Phase, 50/ 60 Hz, 2Kva Control Transformer, Primary: 0/ 415Vac, Secondary: 0/ 230Va C, Copper Winding, Insulation: Class F, Efficiency: Min 95%, Cooling: Natural Air, Conforming To Is 2026/1117 1. Manufacturers Test Certificate Shall Be Submitted Along With The Supply. [ Warranty Period: 12 Months After The Date Of Delivery ] ] , Single Phase, 50/ 60 Hz, 2Kva Control Transformer, Primary: 0/ 415Vac, Secondary: 0/ 110Va C, Copper Winding, Insulation: Class F, Efficiency: Min 95%, Cooling: Natural Air, Conforming To Is 2026/1117 1. Manufacturers Test Certificate Shall Be Submitted Along With The Supply. [ Warranty Period: 12 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2025-10-10. This is a Transformer Supply tender in Bangalore, Karnataka
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free