Rail Wheel Factory
Important Info
AOC Description
Rail Wheel Factory has published Supply Of Spares For Godrej 3 And 8 Ton Forklift. ( 9 Items).Spares For Godrej 3 And 8 Ton Forklift. ( 9 Items).,Wheel Nut To Godrej Part No.31161700Dg00036 For The Use Of Godrej 3 Ton Forkl Ift. 1) Warranty/Guarantee Period Shall Be For A Period Of Minimum 6 Months From The Date Of Fitment Or 9 Months From The Date Of Supply Whichever Is Early Against Quality Manufacturing Defects And Workmanship For The Item Supplied. 2) Authorization From Oem I S To Be Enclosed Along With The Offer. [ Warranty Period: 9 Months After The Date Of Delivery ] ] , Control Valve Assembly To Godrej Part No:40141608Sd00027 For The Use Of Godr Ej 3 Ton Forklift. 1) Warranty/Guarantee Period Shall Be For A Period Of Minimum 6 Months Fr Om The Date Of Fitment Or 9 Months From The Date Of Supply Whichever Is Early Against Qual Ity Manufacturing Defects And Workmanship For The Item Supplied. 2) Authorization From Oe M Is To Be Enclosed Along With The Offer. [ Warranty Period: 9 Months After The Date Of Delivery ] ] , Cap Screw To Godrej Part No:25174898Pa00834 For The End Use On Rotator Attac Hment 607105/150D Of Godrej Make 8 Ton Forklift. 1) Warranty/Guarantee Period Shall Be For A Period Of Minimum 6 Months From The Date Of Fitment Or 9 Months From The Date Of Supply Whichever Is Early Against Quality Manufacturing Defects And Workmanship For The Item Su Pplied. 2) Authorization From Oem Is To Be Enclosed Along With The Offer. [ Warranty Period: 9 Months After The Date Of Delivery ] ] , Filter Element Secondary To Godrej Part No:40161515Pa00057 For The Use Of God Rej 3 Ton Forklift. 1) Warranty/Guarantee Period Shall Be For A Period Of Minimum 6 Months F Rom The Date Of Fitment Or 9 Months From The Date Of Supply Whichever Is Early Against Qu Ality Manufacturing Defects And Workmanship For The Item Supplied. 2) Authorization From Oem Is To Be Enclosed Along With The Offer. [ Warranty Period: 9 Months After The Date Of Deliver Y ] ] , Filter Return Line To Godrej Part No:40161515Pa00008 For. Last date of submission for this tender is 2026-01-02. This is a Lifting Equipment tender in Bangalore, Karnataka
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

