Bharat Coking Coal Limited
- AOC value
- ₹4.99L
- AOC date
- 18 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 Sep 25AOC date
- -Published
- -Closes
- -Bid opens
- 18 Sep 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/09/2025
- Authority
- Bharat Coking Coal Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Bharat Coking Coal Limited has published Various Job Such As Rope ( 25Mm Dia ) Transportation, Rope Laying, Rope Splicing, Ng Sleeper Transportation , 60Lbs Rail Crossing Transportation Etc.For Smooth Transportation Of Materials In D-18 Panel Ofxvi ( T ) Seam At Moonidih Colliery W.J Area.- 1 Various Job Such As Rope ( 25Mm Dia ) Transportation, Rope Laying, Rope Splicing, Ng Sleeper Transportation , 60Lbs Rail Crossing Transportation Etc.For Smooth Transportation Of Materials In D-18 Panel Ofxvi ( T ) Seam At Moonidih Colliery W.J Area. 2 Transportationof Six Nos Crossings Of 60 Lbs Rails From Surface To D18 Panel By Manual & By Track / Haulage In Xvi ( T ) Seam. Total Nos Of Trolley Required = 6, Required Manshift= 6 Manshift X 2Shift Per Trolley. Total Manshift= 6X2x6= 72 3 Transportationof 25Mm Haulage Rope For Jsdb-19 ( 230M ) Winch & Jsdb-30 ( 700M ) Winch From Pit Top To 40Mh Pit Bottom Including Loading. Manshift Required For Loading Of Ropes= 10 Manshift ( Unskilled ) 4 Transportation Of Haulage Ropes From Surface To Ug & Laying Thereoffor Jsdb-19 ( 230M ) Winch & Jsdb-30 ( 700M ) .Manshift Required For Transportation= 6 Manshift X 4 Shift= 24 Unskilled For Laying=10 Manshift X 2 Shift= 20 Unskilled. Total=44 Manshift 5 Transportation Of 8Nos Empty Trolley Form D-18 Panel To Surface For Repairing. Manshift Required= 6Manshift X 2Shift= 12 Manshift ( Unskilled ) 6 Dismantling Of Two Nos Of Endless Haulage Pulley From D-17 Tg & Transportingone From D-17Tg Tail End To D-17 Bg Tail-End And Other From D17 Tg / 6Th Dip Jn To D18tg Tail-End. Manshift Required= 8Manshift ( Unskilled ) X 2Shift+8Manshift ( Unskilled ) X 2Shift= 32 Manshift 7 Shifting Of 60 Lbs Tracklines For Alignment According To Endless Rope In D-18 Tg For Smooth Transportation. Manshift Required= 8Manshift X 4Shift= 32 Manshift ( Unskilled ) 8 Transportation Of Controller And Its Cables From Old 8Th Dip 500Mh Loco Level To Surface For Repairing. Manshift Required= 8Manshift X 2Shift= 16 Manshift ( Unskilled ) 9 Endless Haulage Rope Laying &Splicingin D-18 Tg. Manshift Required= 8Manshift X 2Shift= 16 Manshift ( Unskilled ) 10 Transportation Of 500Ng Sleepers From 5Th Dip / 400Mh Jn. To 8Th Dip / D-18 Bg By Manually. Manshift Required=10 Sleeper / Manshift ( Unskilled ) =500 / 10=50 Manshift 11 Cmpf 12 Cmpf, Pension And Admin. Charge Of Employee Un Skilled 13 Total Impact Of Gst For The Purpose Of Ctc. Last date of submission for this tender is 2024-03-21. This is a Man Power Supply tender in Moonidih, Jharkhand
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free