🎉 Your free trial plan has started. Plan will expire in 0 days

Public Works Department

jammu and kashmir

AOC value
₹1.08Cr
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Public Works Department has published Bids Are Invited For G. I. 15 Mm Dia - Gi Pipe: Isi Marked Galvanized Mild Steel Tubes Electric Resistance Welded ( Erw ) High Frequency Induction Welded ( Hfiw ) Hot Finished Welded Conforming To Is:1239 Part I / 1990 ( Re-Affirmed 1995 ) With Amendment 1 To 5, In Random Lengths Of 4 To 7 Mtrs, Screwed On Both Ends As Per Is 554 / 1990 Socketed At One End And Other End Protected With Plastic Protector. , G. I. 40 Mm Dia - Gi Pipe: Isi Marked Galvanized Mild Steel Tubes Electric Resistance Welded ( Erw ) High Frequency Induction Welded ( Hfiw ) Hot Finished Welded Conforming To Is:1239 Part I / 1990 ( Re-Affirmed 1995 ) With Amendment 1 To 5, In Random Lengths Of 4 To 7 Mtrs, Screwed On Both Ends As Per Is 554 / 1990 Socketed At One End And Other End Protected With Plastic Protector. , G. I. 50 Mm Dia - Gi Pipe: Isi Marked Galvanized Mild Steel Tubes Electric Resistance Welded ( Erw ) High Frequency Induction Welded ( Hfiw ) Hot Finished Welded Conforming To Is:1239 Part I / 1990 ( Re-Affirmed 1995 ) With Amendment 1 To 5, In Random Lengths Of 4 To 7 Mtrs, Screwed On Both Ends As Per Is 554 / 1990 Socketed At One End And Other End Protected With Plastic Protector. , G. I. 100 Mm Dia - Gi Pipe: Isi Marked Galvanized Mild Steel Tubes Electric Resistance Welded ( Erw ) High Frequency Induction Welded ( Hfiw ) Hot Finished Welded Conforming To Is:1239 Part I / 1990 ( Re-Affirmed 1995 ) With Amendment 1 To 5, In Random Lengths Of 4 To 7 Mtrs, Screwed On Both Ends As Per Is 554 / 1990 Socketed At One End And Other End Protected With Plastic Protector. , Hdpe 110 Mm Dia - The Hdpe Pipe Material Should B As Per Is ( High Density Polyethylene Pipes For Water Supply Specification. ) Material Grade Pn-16 Pe-100 Confirming To Is:4984 / 95 And 4954 / 2016 And The Material Grade Shall Be As Specified In Boq. The Hdpe Pipes And Fitting Shall Be Procured Form The Authorized Manufacturer / Registered Authorized Dealer Only And Shall Be Got Inspected By Third Party Inspection Agency M / S Rites Delhi / Edlipse Engineering Global Pvt. Ltd Noida Or Authorized / Approved Agency By Goi Understanding Norms. The Inspection Fee For Third Party Inspection Shall Be Paid By The Contractor Along The Factory Test Certificate. The Hdpe Pipes And Fittings Procured Through Dealers / Stockiest Will Not Be Allowed To Be Used In Jjm Works. , Hdpe 125 Mm Dia - The Hdpe Pipe Material Should B As Per Is ( High Density Polyethylene Pipes For Water Supply Specification. ) Material Grade Pn-16 Pe-100 Confirming To Is:4984 / 95 And 4954 / 2016 And The Material Grade Shall Be As Specified In Boq. The Hdpe Pipes And Fitting Shall Be Procured Form The Authorized Manufacturer / Registered Authorized Dealer Only And Shall Be Got Inspected By Third Party Inspection Agency M / S Rites Delhi / Edlipse Engineering Global Pvt. Ltd Noida Or Authorized / Approved Agency By Goi Understanding Norms. The Inspection Fee For Third Party Inspection Shall Be Paid By The Contractor Along The Factory Test Certificate. The Hdpe Pipes And Fittings Procured Through Dealers / Stockiest Will Not Be Allowed To Be Used In Jjm Works. , Hdpe 140 Mm Dia - The Hdpe Pipe Material Should B As Per Is ( High Density Polyethylene Pipes For Water Supply Specification. ) Material Grade Pn-16 Pe-100 Confirming To Is:4984 / 95 And 4954 / 2016 And The Material Grade Shall Be As Specified In Boq. The Hdpe Pipes And Fitting Shall Be Procured Form The Authorized Manufacturer / Registered Authorized Dealer Only And Shall Be Got Inspected By Third Party Inspection Agency M / S Rites Delhi / Edlipse Engineering Global Pvt. Ltd Noida Or Authorized / Approved Agency By Goi Understanding Norms. The Inspection Fee For Third Party Inspection Shall Be Paid By The Contractor Along The Factory Test Certificate. The Hdpe Pipes And Fittings Procured Through Dealers / Stockiest Will Not Be Allowed To Be Used In Jjm Works. Total Quantity : 1. Last date of submission for this tender is 2021-10-04. This is a Screws tender in null, Jammu And Kashmir

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in