Public Health Engineering Department
jammu and jammu rural, jammu and kashmir
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Public Health Engineering Department
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Public Health Engineering Department has published Annual Rate Contract For Repair Maintenance Of Submersible Vt Pumps Allied Works Annual Rate Contract For Repair Maintenance Of Submersible Vt Pumps Allied Works , Sub Pump V4 , Disconnecting Of Power Connections From Starter Panel , Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell , Stacking Of Column Pipes And Submersible Cable Properly And Dismantling Of Nrv . , Loading Of Submersible Pump Set In Mechanical Transport , Carriage To The Workshop And Unloading . Dismantling Of Submersible Pump Set At Workshop And Checking For Its Repair . , Repairing To Pump Shaft By Way Of Welding , Turning And Polishing To The Actual Size , Making Of Key Way . , Providing And Fitting Of New Pump Shaft . , Providing And Fitting Of New Impeller . , Providing And Fitting Of New Neck Ring . , Providing And Fitting Of Shaft Sleeve . , Providing And Fitting Of Coupling With Key . , Providing And Fitting Of Bearing Bush . , Providing And Fitting Of Bowl , Providing And Fitting Of Diffuser . , Repairing Of Rotor Shaft By Way Of Welding To Ends , Turning And Polishing To The Required Size . , Providing And Fitting Of Thrust Bearing Set , Providing And Fitting Of Bearing Bush For Motor Bowl , Providing And Fitting Of Motor Bowl Upper/ Lower , Assembling Of Pump And Then Coupling With Motor With Proper Alignment . Testing In Test Pit At Workshop . Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site , Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly . Making Of Each Joint Water Proof . Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts . Making Of Connections To The Starter Panel And Testing Thereof . , Sub Pump V6 , Disconnecting Of Power Connections From Starter Panel , Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell , Stacking Of Column Pipes And Submersible Cable Properly And Dismantling Of Nrv . , Loading Of Submersible Pump Set In Mechanical Transport , Carriage To The Workshop And Unloading . Dismantling Of Submersible Pump Set At Workshop And Checking For Its Repair . , Repairing To Pump Shaft By Way Of Welding , Turning And Polishing To The Actual Size , Making Of Key Way . , Providing And Fitting Of New Pump Shaft . , Providing And Fitting Of New Impeller . , Providing And Fitting Of New Neck Ring . , Providing And Fitting Of Shaft Sleeve . , Providing And Fitting Of Coupling With Key . , Providing And Fitting Of Bearing Bush . , Providing And Fitting Of Bowl , Providing And Fitting Of Diffuser . , Repairing Of Rotor Shaft By Way Of Welding To Ends , Turning And Polishing To The Required Size . , Providing And Fitting Of Thrust Bearing Set , Providing And Fitting Of Bearing Bush For Motor Bowl , Providing And Fitting Of Motor Bowl Upper/ Lower , Assembling Of Pump And Then Coupling With Motor With Proper Alignment . Testing In Test Pit At Workshop . Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site , Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly . Making Of Each Joint Water Proof . Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts . Making Of Connections To The Starter Panel And Testing Thereof . , Sub Pump V8 , Disconnecting Of Power Connections From Starter Panel , Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell , Stacking Of Column Pipes And Submersible Cable Properly And Dismantling Of Nrv . , Loading Of Submersible Pump Set In Mechanical Transport , Carriage To The Workshop And Unloading . Dismantling Of Submersible Pump Set At Workshop And Checking For Its Repair . , Repairing To Pump Shaft By Way Of Welding , Turning And Polishing To The Actual Size , Making Of Key Way . , Providing And Fitting Of New Pump Shaft . , Providing And Fitting Of New Impeller . , Providing And Fitting Of New Neck Ring . , Providing And Fitting Of Shaft Sleeve . , Providing And Fitting Of Coupling With Key . , Providing And Fitting Of Bearing Bush . , Providing And Fitting Of Bowl , Providing And Fitting Of Diffuser . , Repairing Of Rotor Shaft By Way Of Welding To Ends , Turning And Polishing To The Required Size . , Providing And Fitting Of Thrust Bearing Set , Providing And Fitting Of Bearing Bush For Motor Bowl , Providing And Fitting Of Motor Bowl Upper/ Lower , Assembling Of Pump And Then Coupling With Motor With Proper Alignment . Testing In Test Pit At Workshop . Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site , Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly . Making Of Each Joint Water Proof . Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts . Making Of Connections To The Starter Panel And Testing Thereof . , Sub Pump V10 , Disconnecting Of Power Connections From Starter Panel , Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell , Stacking Of Column Pipes And Submersible Cable Properly And Dismantling Of Nrv . , Loading Of Submersible Pump Set In Mechanical Transport , Carriage To The Workshop And Unloading . Dismantling Of Submersible Pump Set At Workshop And Checking For Its Repair . , Repairing To Pump Shaft By Way Of Welding , Turning And Polishing To The Actual Size , Making Of Key Way . , Providing And Fitting Of New Pump Shaft . , Providing And Fitting Of New Impeller . , Providing And Fitting Of New Neck Ring . , Providing And Fitting Of Shaft Sleeve . , Providing And Fitting Of Coupling With Key . , Providing And Fitting Of Bearing Bush . , Providing And Fitting Of Bowl , Providing And Fitting Of Diffuser . , Repairing Of Rotor Shaft By Way Of Welding To Ends , Turning And Polishing To The Required Size . , Providing And Fitting Of Thrust Bearing Set , Providing And Fitting Of Bearing Bush For Motor Bowl , Providing And Fitting Of Motor Bowl Upper/ Lower , Assembling Of Pump And Then Coupling With Motor With Proper Alignment . Testing In Test Pit At Workshop . Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site , Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly . Making Of Each Joint Water Proof . Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts . Making Of Connections To The Starter Panel And Testing Thereof . , Vt Pump 1 . 80 Lac Gph X 34 . 5 Mtr . , Extraction Of Vt Pump Set Complete Including Liner Assembly And Pump Assembly After Disconnecting Of All The Power Connections , Dismounting Of Motor Using Special Tools And Tackles , Skilled Man Power . , Loading Of Complete Pump Set Into Mechanical Transport And Carriage To Workshop And Unloading Thereof . , Dismantling Of Pump Assembly , Checking Of Parts Needs To Be Repaired/ Replaced Including Liner Assembly . , Dismantling Of Pump Assembly , Checking Of Parts Needs To Be Repaired/ Replaced Including Liner Assembly . , Lowering Of Vt Pump Set Complete Including Linear Assembly With Proper Alignment , Fitting Of Discharge Head , Delivery Line , Packing Box , Ratchet Assembly , Coupling Pulley And Fitting Of Motor . Making Of Connections , Check. Last date of submission for this tender is 2020-06-22. This is a Wrenches And Drivers tender in Jammu And Jammu Rural, Jammu And Kashmir
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1pdfPDF document
- Tender Document 2pdfPDF document
- Tender Document 3htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free