Power Development Department
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Power Development Department
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Power Development Department has published Annual Rate Contract for improvement/Erection of HT/LT network & Creation/Augmentation of Sub Stations of various capacities under various schemes including maintenance/emergent nature / restoration works falling under the jurisdiction of Electric Division JPDCLKishtwar for the year 2025-26- 1 Unloading of ST pole13 Mtr long 2 Average carriage of ST Pole13 Mtr long upto 100 Mtr 3 Average carriage of ST Pole 13 Mtr long upto 100 - 200 Mtr 4 Erection ofST Pole 13 Mtr long 5 Unloading of ST Pole11 Mtr long 6 Average carriage of ST pole 11 Mtr long upto 100 Mtr 7 Average carriage of ST pole11 Mtr long upto 100 - 200 Mtr 8 Erection ofST 11 Mtr Pole 9 Unloading of ST pole 9 Mtr long 10 Average carriage of ST pole 9 Mtr long upto 100 Mtr 11 Average carriage of ST Pole 9 Mtrlong upto 100 - 200 Mtr 12 Erection ofST 9 Mtr Pole 13 Unloading of ST Pole 8 Mtr long 14 Average carriage of ST pole 8 Mtr long upto 100 Mtr 15 Average carriage of ST pole 8Mtr long upto 100 - 200 Mtr 16 Erection ofST 8 Mtr Pole 17 Cement Bottoming in 1:2:4 ratio of ST Poles of all sizes (Material for Cement Bottoming is to be provided byDepartment) 18 Cement Bottoming in 1:2:4 ratio of ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor) 19 Branch Cutting of HT/LT lines 20 Unloading of Line Materials such as ACSRconductor,nut and bolts,C.I/M,S chennels, HT/LT cables ,link/DO/GO/HGsets etc…etc 21 Average carriage of Line Material upto 100 Mtr 22 Average carriage of Line materialupto 100 - 200 Mtr 23 Fixing ofC.I/M S Channels 8/ 9 /10 feet long with nut and bolts 24 Fixing ofC.I/M S Channels 4/5/6/7 feet long along with Braces andnut and bolts 25 Fixing ofC.I/M S Angle Iron 8/9/10 feet long with nut and bolts 26 Fixing of C.I/M S Angle Iron 3/4/5 feet long with nut and bolts 27 Installation of Link/DO/HG/Knife/LA Set 28 Insatalltion of GO Set 29 Fixing/Installation of 11 KV Pin Insulators with Pins 30 Fixing/Installation of 11 KV Disc Insulators with fittings 31 Unloading of CT/PT Unit 32 Average carriage of CT/PT Unit upto 100 Mtr 33 Average carriage of CT/PT upto 100 - 200 Mtr 34 Erection of CT/PT Unit along with Trivector Meter 35 Erection of CTPT Unit 36 loading of 25/63/100KVA Transformer (New/Repair) 37 Unloading of 25/63/100KVA Transformer (New/Repair) 38 Tightening of loose conductor sq/weasel/Dog 39 Route clearance for making path 40 Survey of Route Alignment for new lines (HT/LT) 41 Guard Nettingin HTlines 42 Iron work such as fabrication of steel work at site 43 Drilling of Holes at site 44 Erection/installation of MCCB Complete job 45 Mounting of 250/400/500/630KVA Transformer 46 Fixing of11 KV Jumpers 47 Painting of poles with channel/brace/clamps complete job 48 Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCBwith Box 49 Earthing of Substation complete (Poles,Transformer,CT/PT,LA) 50 Testing and commissioning of CT/PT Unit 51 Testing and commissioning of Substation 52 Laying of ACSR Conductor on Ground 20/30 mmsq 53 Laying of ACSR Conductor on Ground 50/100 mmsq 54 Stringing of ACSR Conductor 20/30mmsq/Squirell /Weasel 55 Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog 56 Erection of Guys in HT/LT Line complete job 57 Fixing of U-Clamps and Shackle Insulators with nut and bolts 58 Fixing of Suspension/Anchoring Clamps 59 Laying of HT AB/XLPE Cable 25/35/50 mmsq 60 Laying of HT AB/XLPE Cable 70/95/120 mmsq 61 Laying of HT AB/XLPE Cable 150/185mmsq 62 Laying of HT AB/XLPE Cable 240/300 mmsq 63 Laying of LT AB/XLPE Cable 25/35/50 mmsq 64 Laying ofLT AB/XLPE Cable 70/95/120 mmsq 65 Laying of LT AB/XLPE Cable 150/185mmsq 66 Laying of LT AB/XLPE Cable 240/300 mmsq 67 Dismantling of old HT AB/XLPE Cable 25/35/50 mmsq 68 Dismantling of old HT AB/XLPE Cable 70/95/120 mmsq 69 Dismantling and carriage to storesHT AB/XLPE Cable 150/185mmsq 70 loading/Unloading and carrriage of HT AB Cable of 50/120/240 mmsq 71 Dismantling of oldLT AB/XLPE Cable 25/35/50 mmsq 72 Dismantling of old LT AB/XLPE Cable 70/95/120 mmsq 73 Dismantling of oldLT AB/XLPE Cable 150/185mmsq 74 Dismantling of oldLT AB/XLPE Cable 240/300 mmsq 75 Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT/LT Lines 76 Fixing of Mid SpanStraight Jointer Kit for AB/XLPE cables ofHT/LT Lines 77 Dismantling of oldLT AB/XLPE Cable 240/300 mmsq 78 Testing and commissioning of AB/XLPE cables ofHT/LT Lines 79 Inspection of AB/XLPE cables ofHT/LT Lines 80 Dismantling ofOld Squirell ACSR Conductor 81 Dismantling ofOld Weasel ACSR Conductor 82 Dismantling of Old RabbitACSR Conductor 83 Dismantling ofOld Dog ACSR Conductor 84 Dismantling of Pin/ Disc/Shackle Insulators 85 Dismantling of oldM S Channels 8/9/10 feet long 86 Dismantlingof old MS Channels 4/5/6/7 feet long along with Braces 87 Dismantling of old M S Angle Iron 8/9/10feet long 88 Dismantling of oldMS Angle Iron4/5/6 /7 feet long 89 Dismantling of oldLink/DO/HG/Knife/LA Set 90 Dismantling of old GO Set 91 Dismantling of old 11KVJumper 92 Dismantling ofdamaged LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCBwith Box 93 Un-mounting of 25/63/100KVA Transformer 94 Un-mounting of 250/400/500/630KVA Transformer 95 Dismantling of existingPCC Pole 9 Mtr Long 96 Dismantling ofexisting PCC Pole 8 Mtr Long 97 Dismantling of existing ST Pole 13 Mtr Long 98 Dismantling ofexisting ST Pole 11 Mtr Long 99 Dismantling ofexisting ST Pole 9 Mtr Long 100 Dismantling ofexisting ST Pole 8 Mtr Long 101 Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by department for this item) 102 Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by Contractor for this item) 103 Carriage of T and P items 104 Watch and Ward of Material 105 Fixing of Single/Three Phase Meters along with Service Line 106 Erection of DB/MeterBox on PCC/ST Poles 107 Write back of Dismantled Material such as ACSRconductor, C.I/M,S chennels, HT/LT cables ,link/DO/GO/HGsets etc…etc to Divisional StoreZelnaKishtwar 108 Re- Erection of UprootedST poles Poles 8/9/11/13 mtrslong 109 Average carriage of 25KVA upto 100 Mtr 110 Average carriage of 63 KVA upto 100 Mtr 111 Average carriage of 100/250/400/630 KVA upto 100 Mtr through Mechanical/manual means 112 Loading of 250/400/500/630 KVA Transformer by mechanical /manual means 113 Unloading of 250/400/500/630 KVA Transformer by mechanical/manual means 114 Average carriage of 250/400/500/630 KVA for 100 -200 Mtr by mechanical/manual means 115 Average carriage of 25KVA DT FROM 100-200 Mtrmanually 116 Average carriage of 63KVA DT FROM 100-200 Mtr manually 117 Average carriage of 100 KVA 100 - 200 Mtr through mechanical/manual means . Last date of submission for this tender is 2025-09-15. This is a Overhead Line tender in Doda, Jammu And Kashmir
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free