🎉 Your free trial plan has started. Plan will expire in 0 days

Power Development Department

budgam, jammu and kashmir

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Power Development Department has published Supply, Installation, Testing And Commissioning Of Distribution Transformers And Various Line Materials For Improvement Cum Stabilization Of Electrical Network Under Ddc Grants In Ed Budgam -2 Supply, Installation, Testing And Commisioning Of11 / 0.433Kv, 3-Phase ( Ee Level-Ii ) Distribution Transformers 63 Kva With Bimetallic Terminal Complete In All Respect As Per Rec Standard ( As Mentioned In Sbd ) 3 Supply, Installation, Testing And Commisioning Of 9 Mtr ( 410 Sp-33 ) Long Steel Tubular Poles Complete With Base Plate ( 300X300x5mm ) , Top Cap, Including Digging Of Pit ( 1 / 6Th Of Pole Height ) Positioning Etc, Complete In All Respect As Per Rec Standard ( As Mentioned In Sbd ) 4 Supply, Installation, Testing And Commisioning Of 8 Mtr ( 410 Sp-15 ) Long Steel Tubular Poles Complete With Base Plate ( 300X300x5mm ) , Top Cap, Including Digging Of Pit ( 1 / 6Th Of Pole Height ) Positioning Etc, Complete In All Respect As Per Rec Standard ( As Mentioned In Sbd ) 5 Supply, Laying, Stringing, Tensioning, Binding Of 50 Sqmm Acsr Conductor Complete In All Respects As Per Rec Standards ( As Mentioned In Sbd ) . 6 Supply, Laying, Stringing, Tensioning, Binding Of 30 Sqmm Acsr Conductor Complete In All Respects As Per Rec Standards ( As Mentioned In Sbd ) 7 Supply, Carraige Upto Site And Fixing Of Gi V Cross Arm & Gi F Top With Clamps Duly Fabricated As Per Site Requirement Including Clamps ( 50X6 Mm ) , Gi Nuts & Bolts, Washers Etc Complete In All Respects As Per Rec Standards. 8 Supply, Carraige Upto Site, Fixing And Installation Of Gi Channels Of Different Sizes Including Clamps And Braces. 9 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of 11 Kv Porecelain Composite Pin Insulators 12 Kv.5Kn, Lighting Impulse 75 Kv Positive And 80 Kv Negative, Creepage Distance 320Mm Complete In All Respects As Per Rec Standards 10 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of Gapless Surge Arrestor 9 Kv, 10 Ka, La With Polymer Housing, Stn. Type Complete In All Respects As Per Rec Standards. 11 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of 11 Kv G.O Ab Switch 3-Phase, 3Pole 200-Amp, Vertical Type With Fittings Complete In All Respects As Per Rec Standards. 12 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of 11 Kv Horn Gap Fuse Set 3 Phase 200Acomplete In All Respects As Per Rec Standards. 13 Supply, Carraige Upto Site, Laying, Stringing, Tensioning, Binding Of 1.1 Kv Grade, 1-Core 185 Sqmm Pvc Conductor Frls Type Complete In All Respects As Per Rec Standards 14 Supply, Carraige Upto Site, Fixing Ofaluminium Thimbles Of Size 185 Sqmm. 15 Supply, Carraige Upto Site, Fixing And Commissioning Of Aluminium Solderless Clampsof Size 185 Sqmm. 16 Supply, Carraige Upto Site, Installation, Testing And Commissioning Oflt Fuse Unit Complete In All Respects As Per Standards 17 Earthing Of Substation-Excavation Ofearth Pit Of Dia650 Mm & Depth 3000 Mm, Installation Of Earthing Pipe Of 40 Mm Nominal Bore & 4Mm Wall Thickness & Length 2.5 Mtr Long As Per Is 1239. Gi Strip For Neutral Earthing Of Size 75 Mmx10 Mm, 50 Mmx6 Mm For Connection Of Transformer Body & Lightening Arrestor As Per Is 2629 / 85, Gi Nuts & Bolts, Refilled With Earth Enhancement Materials And Earth Chamber Made Of Brick Masonary With Rcc Slab Cover. 18 Supply, Carraige Upto Site, Fixing Of G I Muky Clamps. As Per Standards 19 Supply, Carraige Upto Site, Fixing Of Shackale Insulators. 20 Cement Bottoming Of S T Poles In 1:2:4 Mix, Up To 1 / 6Th Plantation Depth Of Polebelow Ground, 9 Above Ground, Circular With Radius 6 Around The Pole Girth / Surface , Top Surface Tappered Outwards0.5 Cum / Pole As Per The Diagram Given In Technical Specifications. 21 Earthing Of Steel Tubular Poles Complete By Gi Pipe 40Mm Or Gi Rod 20Mm 2.5Mtr Long Through Gi Strip. 22 Painting Of Poles With One Coat Of Red Oxide ( 1Ltr / Pole ) And Two Coats Of Alimunium Paint ( 1Ltr / Pole ) . 23 Supply And Fixing Of Anti Climbind Device Complete In All Respects As Per Rec Standards 24 Supply And Fixing Of Danger Plates Complete In All Respects As Per Rec Standards 25 Note: 1.The Rates Quoted By The Bidder For All The Items Shall Be Inclusive Of Gst / Freight / Insurance / Storage / Installation / Testing And Any Other Charges For Creation Of 63 Kva New Substations Along With Ht / Lt Networkunder The Jurisdiction Of Ed Budgam, Kpdcl.. Last date of submission for this tender is 2022-06-10. This is a Distribution Transformer tender in Budgam, Jammu And Kashmir

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1pdf
  • Tender Document 2pdf
  • Tender Document 3html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in