Power Development Department
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Power Development Department
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Power Development Department has published Rate Contract For Preventive / Routine / Breakdown Maintenance Of Components For Various Transmission Lines Falling Under The Jurisdiction Of Tlmd-Viii, Jkptcl, Jammu For The Year 2023-24.- 1 Transmission Line S / C And D / C :- ( Including Carriage Of T&P From Stores And Shutdown Factor ) 2 Break-Down Work ( Emergency Works ) For 132Kv Lines 3 Jumpers ( Replacement Of Burnt / Damaged Jumpers And Tightening Of Remaining Jumpers On The Same Tower ) 4 Disc Insulators ( Replacement Of Damaged Disc Insulators ) 5 Tension String 6 Suspension String 7 Power Conductor 8 Restoration Of Snapped Power Conductor. Complete Job Including Mid-Span Compression Joint, Laying Of Conductor, Rough Sagging, Tensioning Of Conductor Dead-End Assembly Etc. Upto Span Of 500 Metre Tension To Tension Point 9 Earth Wire 10 Restoration Of Snapped Earthwire Complete Job Including Mid-Span Compression Joint, Laying Of Conductor, Rough Sagging, Tensioning Of Earthwire, Dead-End Assembly Etc. Upto Span Length Of 500 Metre Tension To Tension Point 11 Planned Works 12 Checking And Tightening Of Jumpers ( Per Ckt With 6 Jumpers ) 13 Checking And Tightening Of Jumpers ( Per Ckt With 3 Jumpers ) 14 Replacement Of Damaged / Burnt Out Jumpers 15 Fixing Of Damper / Vibrator On Earthwire / Acsr Conductor 16 Replacement Of Damaged Disc Insulators 17 Tension String 18 Suspension String 19 Repairing Of Power Conductor When Lowering Of Conductor Is Necessary. Complete Job Including Laying Of Conductor, Making Of Compression Joint, If Any, Rough Sagging Tensioning Of Conductor, Fixing Dead End Assembly Etc. Upto Span Of 500 Meter Tension 20 Stringing And Saging Of Acsrconductor Including Sagging, Tensioning, Fitting Of Dead End Assamblies Etc. ( Complete Job ) 21 Repairing Of Ground Wire When Lowering Of Conductor Is Necessary. Complete Job Including Laying Of Conductor, Making Of Compression Joint, If Any, Rough Sagging Tensioning Of Conductor, Fixing Dead End Assembly Etc. Upto Span Of 500 Meter Tension 22 Stringing And Saging Of Ground Wire Including Sagging, Tensioning, Fitting Of Dead End Assamblies Etc. ( Complete Job ) 23 Tower S / C And D / C:- ( Including Carriage Of T&P From Stores And Shutdown Factor ) 24 Foundation:-Repairing Of Damaged Foundation And Protection Wall ( Revetment ) Including Back Filling Of Earthwith Rcc Concreating. 25 Provision Of Providing Crate Wall ( Gabbon Wall ) 26 Tightening Of Nuts And Bolts Of Tower Superstructures Replacement Of Missing Ones. 27 A ) Tower Weight More Than 4 Tonnes To 7.5 Tonnes 28 B ) Tower Weight More Than 7.5 Tonnes 29 Checking / Tightening Of Tower Footing Earthing Bolts And Measuring Tower Footing Resistance. 30 Earthing Of Towers Inclusive Of Material ( Earthing Rod, Strips, Good Earth Etc ) 31 Normal Type ( Rates Inclusive Of Material ) 32 Counterpoise ( Rates Inclusive Of Material ) 33 Branch Cutting: Under The Coridor Of 132 Kv S / C And D / C Transmission Line 16 Mtrand Under Tower Structure 34 Making Of Approach Path Towards The Tower 35 Deweeding Of The Area Under The Tower 36 Replacement Of Missing Tower Members. 37 Reparing Damaged Conductor By Using Helical Sleeve Or Bolted Or By Shorting Method With Out Lowering. The Conductor 38 Fixing Of Anti-Climbing Device / Bird Guardover S / C &D / C Tower 39 Fixing Of Phase Plates / No. Plates / Danger Plates Overs / C & D / C Tower 40 Fixing Of Repair Sleeves Compression Type For Over Acsr Conductor 41 Tag Welding Of Towersfor One Story 42 Dismantling Of Towers 43 A Type 44 B Type 45 C Type 46 D Type 47 Earth Work Of Towers Including Material 48 Lean Pad ( Rates Inclusive Of Material ) 49 Rrm ( Rates Inclusive Of Material ) 50 Dpc ( Rates Inclusive Of Material ) 51 Providing Of Skilled / Semi-Skilled / Unskilled Labour For The Works Which Are Not Covered From S.No. 1 To 1.35 52 Skilled Labour ( Rigger ) 53 Semi-Skilled Labour ( Asstt. Fitter ) 54 Unskilled Labour 55 Store Handling: 56 Unloading / Loading Oft&P Material For Transmission Line Works Including Four Sheaves Pulley, Pulleys, Ropes, Compression Machine Etc In Divisional Stores Gladni Including Manual Carriage Within Store Yard. 57 Unloading / Loading Ofcement In Divisional Store Gladni Including Manual Carriage Within Store Yard ) . 58 Unloading / Loading Ofdisc Insulators / Fittings In Divisional Store Gladni Including Manual Carriage Within Store Yard ) . 59 Unloading / Loading Of Conductor / Earth Wire, Etc In Divisional Store Gladni Including Manual Carriage Within Store Yard ) . 60 Carriage Of T&P And Other Allied Material From Divisional Store To Site Of Work And Back Carriage Of T&P And Material. Last date of submission for this tender is 2023-05-02. This is a Transmission Line tender in Jammu, Jammu And Kashmir
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
2 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free