🎉 Your free trial plan has started. Plan will expire in 0 days

National Highways And Infrastructure Development Corporation Limited

jammu, jammu and kashmir

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

National Highways And Infrastructure Development Corporation Limited has published Consultancy Services For Feasibility Study, Preparation Of Detailed Project Report And Providing Pre-Construction Services For “Construction Of 2Nd Tube Uni-Directionalzojila Tunnel ( 13.14 Km ) From D.Ch. 16.80 To D.Ch. 30.50 Of Nh-1 In The Under Ut Of Jammu & Kashmir-2Nd Call. 1 Schedule A ( Fixed Lumpsum Cost ) 2 Remuneration For Local Staff ( Including Per Diem Allowance ) 3 A. Key Professionals 4 Team Leader Cum Senior Tunnel Engineer ( 1 No ) 5 Tunnel Design Expert ( 1 No ) 6 Senior Geotechnical Engineer ( 1 No ) 7 Seniorgeophysicist ( 1 No ) 8 B. Other Professionals 9 Senior E& M Engineer 10 Senior Geologist 11 Senior Surveyor Engineer 12 Environmental Specialist 13 Material Engineer 14 Quantity Surveyor / Documentation Expert 15 Highway Cum Pavement Engineer 16 Sub-Professional Staff: ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate ) 17 Tbn 18 Tbn 19 Support Staff ( Fixed Rates ) 20 Office Manager ( 1 No. ) 21 Typist ( 1 No. ) 22 Office Boy ( 1 No. ) 23 Night Watchman ( 1 No. ) 24 Transportation ( Fixed Costs ) 25 The Vehicles Hired By The Consultants Shall Include The Cost For Rental, Drivers, Operation, Maintenance, Repairs, Insurance, Etc. For Use Of Consultants ( 2 Vehicle For 10Months Each ) 26 Duty Travel To Site ( Fixed Costs ) 27 All Trips 28 Office Rent ( Fixed Costs ) 29 The Rent Cost Includes Operation & Maintenance, Cleaning, Repairs, Etc For Entire Duration Of Services. 30 Office Supplies, Utilities And Communication ( Fixed Costs ) 31 Office Supplies, Drafting Supplies, Computor Running Costs, Domestic And International Communication 32 Office Furniture And Equipment ( Fixed Costs ) 33 Office Furniture And Equipment 34 Reports And Document ( Fixed Costs ) 35 Monthly Report ( 03 Sets ) 36 Inception Report & Qap 37 Environment And Social Impact Screening Report 38 Draft Feasibility Report 39 Final Feasibility Report 40 Strip Plan With L.A. Reports 41 Draft La And Clearances I Report 42 Final La And Clearances I Report 43 Draft Environmental Assessment Report & Rap 44 Final Environmental Assessment Report & Rap 45 Draft Detailed Design Report & Drawings Etc. 46 Draft Emp 47 Draft Bidding Documents 48 Final Detailed Project Report With Bill Of Quantities, Cost Estimates, Updated Drawings Etc. 49 Final Emp 50 Final Bidding Documents 51 Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 3 Copies Each ) 52 La & Clearances Ii Report 53 Survey And Investigation 54 A.Topographical Survey ( Fixed Rate ) 55 Complete Topographic Survey Using Mobile / Aerial Lidar Or Equivalent / Better Technology For Project Approach Area Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc. Inclusive Of Cost Of Materials, Labourer, Preparation Of Drawings And Their Submission As Per Contract Provision. 56 B. Investigation ( Fixed Cost ) 57 All Investigations / Surveys Including Road And Bridge Inventory, Fwd Test And Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey And Investigation, Sub-Grade Investigation, Traffic Survey, Socio-Economic & Census Survey / Studies, Land Acquisition Studies, Etc. 58 Schedule B ( Item Rate Costs ) 59 Sub-Soil Investigation & Other Works 60 Sub-Soil Investigation 61 A ) Boring In All Type Of Soils ( Other Than Hard Rock ) 62 B ) Boringinhard Rock 63 Resistivity Based Geo-Physical Investigations At Portal Locations Of Tunnel. 64 Cost Of Supply And Fixing Boundary Pillars 65 Procuring And Fixing Boundary Pillars And Its Installation, Complete In All Respect As Per Irc:25, 1967: Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval. 66 Land Acquisition Team Including Support Staff And Logistics / Transportation 67 A. Land Acquisition Team Including Support Staff 68 Ex-Land Revenue Inspector / Officer Or Equivalent 69 Ex-Kanoongo / Girdawar Or Equivalent 70 Ex-Patwari Or Equivalent 71 Typist 72 Peon 73 B. Logistics For Land Acquisition Team 74 Computer Including Necessary Peripherals ( 2 No ) 75 Printers ( 1 Nos ) 76 Vehicles ( Bolero Or Equivalent ) Withmonthly Running Limit Of 4000 Km 77 Grand Total ( Schedule A+B ) . Last date of submission for this tender is 2023-08-16. This is a Peb tender in Jammu, Jammu And Kashmir

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1pdf
  • Tender Document 2pdf
  • Tender Document 3html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in