🎉 Your free trial plan has started. Plan will expire in 0 days

National Hydroelectric Power Corporation Limited

chamba, himachal pradesh

AOC value
₹5.94Cr
AOC date
15 Dec
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 15 Dec 23AOC date

Important info

Result ID
Refer Docs
Award of contract
15/12/2023
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

National Hydroelectric Power Corporation Limited has published Tender For Restoration Of Damage / Eroded Portion Of Dam Toe Of Baira Dam, Nakrod, Bsps; 1 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan ) Including Getting Out And Disposal Of Excavated Earth Lead Up To 50 M And Lift Up To 1.5 M, As Directed By Engineer-In-Charge. 2 Demolishing Cement Concrete Manually / By Mechanical Means Including Disposal Of Material Within 50 Metres Lead As Per Direction Of Engineer - In - Charge.-Nominal Concrete 1:3:6 Or Richer Mix ( I / C Equivalent Design Mix ) 3 Removing Mortar From And Cleaning Stones And Concrete Articles ( Net Quantity Of Stacks Of Cleaned Materials Will Be Measured ) : 4 Providing And Laying In Position Ready Mixed Or Site Batched Design Mix Cement Concrete For Plain Cement Concrete Work; Using Coarse Aggregate And Fine Aggregate Derived From Natural Sources, Portland Pozzolana / Ordinary Portland / Portland Slag Cement, Admixtures In Recommended Proportions As Per Is: 9103 To Accelerate / Retard Setting Of Concrete, To Improve Durability And Workability Without Impairing Strength; Including Pumping Of Concrete To Site Of Laying, Curing, Carriage For All Leads; But Excluding The Cost Of Centering, Shuttering And Finishing As Per Direction Of The Engineer-In-Charge; For The Following Grades Of Concrete. Note: Extra Cement Up To 10% Of The Minimum Specified Cement Content In Design Mix Shall Be Payable Separately. In Case The Cement Content In Design Mix Is More Than 110% Of The Minimum Specified Cement Content, The Contractor Shall Have Discretion To Either Re-Design The Mix Or Bear The Cost Of Extra Cement. All Works Up To Plinth Level :All Works Up To Plinth Level : Concrete Of M25 Grade With Minimum Cement Content Of 300 Kg / Cum 5 Providing And Laying In Position Ready Mixed Or Site Batched Design Mix Cement Concrete For Plain Cement Concrete Work; Using Coarse Aggregate And Fine Aggregate Derived From Natural Sources, Portland Pozzolana / Ordinary Portland / Portland Slag Cement, Admixtures In Recommended Proportions As Per Is: 9103 To Accelerate / Retard Setting Of Concrete, To Improve Durability And Workability Without Impairing Strength; Including Pumping Of Concrete To Site Of Laying, Curing, Carriage For All Leads; But Excluding The Cost Of Centering, Shuttering And Finishing As Per Direction Of The Engineer-In-Charge; For The Following Grades Of Concrete. Note: Extra Cement Up To 10% Of The Minimum Specified Cement Content In Design Mix Shall Be Payable Separately. In Case The Cement Content In Design Mix Is More Than 110% Of The Minimum Specified Cement Content, The Contractor Shall Have Discretion To Either Re-Design The Mix Or Bear The Cost Of Extra Cement. All Works Up To Plinth Level :All Works Above Plinth And Up To Floor V Level : Concrete Of M25 Grade With Minimum Cement Content Of 300 Kg / Cum 6 Providing And Laying In Position Machine Batched And Machine Mixed Design Mix M-25 / A20 Grade Cement Concrete For Reinforced Cement Concrete Work, Using Cement Content As Per Approved Design Mix, Including Pumping Of Concrete To Site Of Laying But Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement, Including Admixtures In Recommended Proportions As Per Is: 9103 To Accelerate, Retard Setting Of Concrete, Improve Workability Without Impairing Strength And Durability As Per Direction Of Engineer-In-Charge.-All Worksabove Plinth Level Up To Floor V Level_ Cement Content Considered In This Item Is @ 340 Kg / Cum. Excess / Less Cement Used As Per Design Mix Is Payable / Recoverable Separately ) .-M25 7 Providing And Laying In Position Ready Mixed Or Site Batched Design Mix Cement Concrete For Plain Cement Concrete Work; Using Coarse Aggregate And Fine Aggregate Derived From Natural Sources, Portland Pozzolana / Ordinary Portland / Portland Slag Cement, Admixtures In Recommended Proportions As Per Is: 9103 To Accelerate / Retard Setting Of Concrete, To Improve Durability And Workability Without Impairing Strength; Including Pumping Of Concrete To Site Of Laying, Curing, Carriage For All Leads; But Excluding The Cost Of Centering, Shuttering And Finishing As Per Direction Of The Engineer-In-Charge; For The Following Grades Of Concrete. Note: Extra Cement Up To 10% Of The Minimum Specified Cement Content In Design Mix Shall Be Payable Separately. In Case The Cement Content In Design Mix Is More Than 110% Of The Minimum Specified Cement Content, The Contractor Shall Have Discretion To Either Re-Design The Mix Or Bear The Cost Of Extra Cement. All Works Up To Plinth Level : 4.20.2.3 All Works Above Plinth And Up To Floor V Level Concrete Of M20 Grade With Minimum Cement Content Of 270 Kg / Cum 8 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For : Small Lintels Not Exceeding 1.5 M Clear Span, Moulding As In Cornices, Window Sills, String Courses, Bands, Copings, Bed Plates, Anchor Blocks And The Like 9 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For : Extra For Shuttering In Circular Work ( 20% Of Respective Centering And Shuttering Items ) 10 Providing And Laying In Position Ready Mixed Or Site Batched Design Mix Cement Concrete For Plain Cement Concrete Work; Using Coarse Aggregate And Fine Aggregate Derived From Natural Sources, Portland Pozzolana / Ordinary Portland / Portland Slag Cement, Admixtures In Recommended Proportions As Per Is: 9103 To Accelerate / Retard Setting Of Concrete, To Improve Durability And Workability Without Impairing Strength; Including Pumping Of Concrete To Site Of Laying, Curing, Carriage For All Leads; But Excluding The Cost Of Centering, Shuttering And Finishing As Per Direction Of The Engineer-In-Charge; For The Following Grades Of Concrete. Note: Extra Cement Up To 10% Of The Minimum Specified Cement Content In Design Mix Shall Be Payable Separately. In Case The Cement Content In Design Mix Is More Than 110% Of The Minimum Specified Cement Content, The Contractor Shall Have Discretion To Either Re-Design The Mix Or Bear The Cost Of Extra Cement. All Works Up To Plinth Level : 4.20.2.2 All Works Above Plinth And Up To Floor V Level Concrete Of M15 Grade With Minimum Cement Content Of 240 Kg / Cum 11 Providing & Making Gabion Structure With Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes As Per Is 16014:2012, Morth Clause 2500, Of Required Size, Mesh Type 10X12 ( D=100 Mm With Tolerance Of ± 2% ) Zinc Coated, Mesh Wire Diameter 3.0 Mm, Mechanically Edged / Selvedged With Partitions At Every 1M Interval And Shall Have Minimum 10 Numbers Of Openings Per Meter Of Mesh Perpendicular To Twist, Tying With Lacing Wire Of Diameter 2.2Mm, Supplied @3% By Weight Of Gabion Boxes, Filled With Boulders With Least Dimension Of 200 Mm, As Per Drawing, All Complete As Per Direction Of Engineer-In-Charge. 12 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For : Walls ( Any Thickness ) Including Attached Pilasters, Butteresses, Plinth And String Courses Etc. 13 Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Up To Plinth Level. : Hot Rolled Deformed Bars 14 Excavating, Supplying And Filling Of Local Earth ( Including Royalty ) By Mechanical Transport Up To A Lead Of 5Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Trenches, Plinth, Sides Of Foundation Etc. Complete. 15 Providing And Laying Backfill Of Compacted / Packed River Bed Material Consisting Of Varying Size Of Boulder / Gravel / Pebbles ( With Max Size 300Mm ) 16 Dewatering Of Surface Construction Sites Including Supply, Installation And Removal Of Pumping Equipment From The Site. 17 Providing And Fixing Ply Wood Lining With Butt Jointing And Nails ( Frame Work And Cover Fillets To Be Measured And Paid For Separately ) 6 Mm Thick 18 High Performance Concrete ( Hpc ) Grade M65 In Spillway / Glacis And Spillway U / S Of Bulk Head Gate Curve Portion. 19 Drilling ( 38Mm Dia, 300 Mm Deep ) For Epoxy Grouted Dowels. 20 Providing L-Shaped Epoxy Grouted Anchor Of 12Mm Dia Steel Anchor ) ( 38 Mm Dia, 300Mm Deep ) 21 Glacis Repair - Providing And Applying Epoxy Resin Binding Agent Complying With Astm C881-78 Type Ii, Grade 2 Class B Or C Before Laying Of Hpc 22 Providing Weep Holes In Brick Masonry / Stone Masonry / Plain Reinforced Concrete Abutment, Wing Wall, Return Wall With 100 Mm Dia Pvc Pipe Extending Through The Full With Of The Structures With Slope Of 1 ( V ) :20 ( H ) Towards Drawing Face Complete As Per Drawing And Technical Specifications Clauses 614. 709, 1204, 3.7. Last date of submission for this tender is 2023-11-08. This is a Excavation Work tender in Chamba, Himachal Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

6 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in