Himachal Pradesh State Electricity Board
- AOC value
- ₹7.58L
- AOC date
- 26 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 26 Aug 23AOC date
- -Published
- -Closes
- -Bid opens
- 26 Aug 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 26/08/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Himachal Pradesh State Electricity Board has published Tender For Supply Of Equipment / Material, Design, Erection, Testing, Commissioning, For Restoration / Re-Alignment Of Various H.T / L.T. Lines Damaged Due To Heavy Rain Fall During Monsoon 2023 In Lieu Of Safety Concerns Under Electrical Sub-Division, Hpsebl Baroh And Tanda. ( Seop-24 / 2023-24 ) .-Restoration / Re-Alignment Of Various H.T / L.T. Lines Damaged 2 Prov. Conductor Aaac 7 / 3.15 ( 55Mm2 ) 3 Prov. Steel Tubular Pole 9 Mtr. Long 4 Prov. Steel Tubular Pole 8 Mtr. Long 5 Prov. Rcc Muff With Concrete Fiiling 6 Prov.X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 12 Nos ] For Incomer Line 7 Angle Iron ( 75X75x6 ) [ Length- 1.50 Mtr + 0.02 Mtr ] 8 Shackle Insulator ( 16 Kn ) 9 D-Iron ( U- Clamps ) Provided By Hpsebl 10 Prov. Lt Ab Cable Size 3 X 95+16+70 Mm² 11 Prov. Suspension Assembly 12 Prov. Façade Hook 13 Prov. Anchoring Assembly 14 Earth Knob 15 Ht Stay Set Provided By Hpsebl 16 Lt Stay Set Provided By Hpsebl 17 Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) Provided By Hpsebl 18 Prov. Go Ab Switch Unit 19 Full Clamps [ 2 No For A.I + 1 No For Stay Set ] 20 Lt Earthing Set Complete 21 Ht Earthing Set Complete 22 Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 23 Aluminium Paint 24 Transportation Charges 25 Erection Chargesfor Cond. 50Mm2 26 Erection Chargesfor St Pole 27 Erection Charges For Ht Stay Set 28 Erection Chargesfor Lt Stay Set 29 Erection Charges For Earthing Of Poles 30 Erection Charges For Go Switches 31 Dismentalment. Charges 32 Quantities Are Mentioned Above Are Tentative And Actual Quantity Shall Be Worked Out After Check Survey To Be Carried Out By The Successful Tender And Detailed Engineering And Finalization Of Tower Location Chart.Payment Shall Be Made As Per Approved Bill Of Material / Actual Quantities Measured At Site.. Last date of submission for this tender is 2023-08-16. This is a Bolts tender in Kangra, Himachal Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1pdfPDF document
- Tender Document 2htmlHTML document
- Tender Document 3pdfPDF document
- Tender Document 4xlsxXLSX document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free