🎉 Your free trial plan has started. Plan will expire in 0 days

Himachal Pradesh State Electricity Board

kangra, himachal pradesh

AOC value
₹6.26L
AOC date
20 Jun
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 20 Jun 23AOC date

Important info

Result ID
Refer Docs
Award of contract
20/06/2023
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Himachal Pradesh State Electricity Board has published Tender For Supply Of Equipment / Material , Design, Erection, Testing & Commissioning For Providing Sop To T / Well Bandial By Providing 11 / 0.4 Kv 63 Kva S / Stn A / W Htline In Electrical Section Bhogerwan Esd Reyunder Ed Fatepur. T.Sno. ( 117 / 2022-23 ) , ( 118 / 2022-23 ) . ( Deposit ) -- 1 11 KV HT Line Providing part 2 Prov. ACSR (6/1/3.35 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} 3 Prov. Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) 4 Prov. Steel Tubular Poles (9 m, Working Load > 227 kgf/m²) 5 Prov. Muffs with concerete filling 6 Prov. C-I X-ArmTop Clamp (100x50x50x5mm) length :460 mm 7 Prov. A-I X-ArmBelt Set (75x75x6mm) length :750mm x2 8 Prov. C-I(100x50x50x5mm) length :1500mm for Single Pole Str 9 Prov. C-I X-Arm S/P, D/P str./G.O.switch (100x50x50x5mm) length :2400mmi/c clamp 10 Prov. AI(75x40x5mm) length :2800mmFor Guard Wire 11 Prov. AI(75x40x5mm) length :2800mm Cross Bracing Set for D/P Str. 12 Prov. AI(75x40x5mm) length :2400mm Cross Bracing Set for D/P Str. 13 Prov. Pin Insulator with GI Pin 14 Prov. Disc Insulator Set cleave & Tounge halicaly formed fitting 15 Prov. GO AB Switch Unit (11kV, 400A,)O/D type 16 Prov. D.O Fuse Unit 17 Prov. HT Stay set complete in all respect 18 Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) 19 Prov. GI Wire 8 SWG. 20 Prov. Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro structure: 2 No ] 21 Prov. Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro structure: 2 No] 22 Prov. Danger Plate (250X200X1.6 mm) 23 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 24 Prov. Barbed Wire 25 Prov. Aluminium Paint 26 Erection 11KV HT line 27 Erection ACSR (6/1/3.35 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} 28 ErectionSteel Tubular Poles Single pole structure (11 m, Working Load > 227 kgf/m²) 29 ErectionSteel Tubular Poles Doublepole structure (11 m, Working Load > 227 kgf/m²) 30 ErectionSteel Tubular Poles Single pole structure (9 m, Working Load > 227 kgf/m²) 31 Erectionof HT Stay Set 32 Erection of G.O AB switch and D.O fuse unit 33 63KVA Trsanformer providing Part 34 Prov. Distribution Transformer (Ordinary), 11/0.4 kV,63 KVA 35 Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) 36 Prov. Muffs with concerete filling 37 Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mmX2 Nos.) for incomer line 38 Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LAs 39 Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mmX4 Nos.)for supporting DO fuse unit & GO switch 40 Prov. Transformer Bed, Belting & Knee Bracing 41 Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mmX2 Nos.) for Transformer Bed 42 Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] 43 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 44 Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos 45 Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing 46 Prov. Transformer LT Distribution Box and GO Switch fixing Assembly 47 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 48 Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos 49 Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm 50 Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type 51 Prov. D.O Fuse Unit 52 Prov. Lighting Arrester, 9 kV Station Class(Porcelain Type) 53 Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) 54 Prov. Stay set complete 55 Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) 56 Prov. Pipe Earthing Set 57 Prov. LT Distribution Panel Box With MCCB(160A, 10KA, 4P, 1No) & SFU(32A, 5No, rewirable) 58 Prov. Half Clamp (M.S. Flat 50X6 mm) 59 Prov. Full Clamps (M.S. Flat 50X6 mm) 60 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 61 Prov. Aluminium Thimble 62 Prov. Copper Thimble 63 Prov. Danger Plate 64 Prov. Barbed Wire 65 Prov. LT Cable (3.5 Core) 120 mm² 66 Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri-Vector meter with Box(CT-100-200/5A) 67 Prov. Aluminum Paint. 68 Prov. Prov. 6/1/3.35mmsq 69 Prov. Transformer structure protection plinth (Civil Work as per HPSR) for 63 KVA S/stn. 70 Prov. All-in-One Desktop 21.5 inches Full HD IPS (intel i5 /8GB/512 GB SSD/Windows 10/Wired Keyboard, Mouse) a/w 600VA UPS. 71 Erection part Sub-Station 72 Add erection charges for Sub-Station . Last date of submission for this tender is 2023-06-12. This is a Electrification Work tender in Kangra, Himachal Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

7 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in