Northern Railway
- AOC value
- ₹2.08Cr
- AOC date
- 9 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 9 Sep 24AOC date
- -Published
- -Closes
- -Bid opens
- 9 Sep 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 09/09/2024
- Authority
- Northern Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Northern Railway has published Supply Of Condenser And Evaporator Coil Assemblycondenser And Evaporator Coil Assembly,Condenser And Evaporator Coil Assembly Of 01 Coach Set And Each Coach Set Must Consist Of 04 Nos Of Condenser Coils (02 Nos Lhs And 02 Nos Rhs) And 04Nos Of Evaporator Coils (02 Nos Lhs And 02 Nos Rhs) Suitable For Sidwal/Intec Lhb R-407C Variant Rmpu As Per Rdso Spec No. Rdso/Ac/0061-2005(Rev-1) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] , Condenser And Evaporator Coil Assembly Of 01 Coach Set And Each Coach Set Must Consist Of 04 Nos Of Condenser Coils (02 Nos Lhs And 02 Nos Rhs) And 04Nos Of Evaporator Coils (02 Nos Lhs And 02 Nos Rhs) Suitable For Amit/Lloyd Lhb R-407C Variant Rmpu As Per Rdso Spec No. Rdso/Ac/0061-2005(Rev-1) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]. Last date of submission for this tender is 2024-08-05. This is a Electrical Condenser tender in jagadhri, Haryana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free