Irrigation Department
- AOC value
- ₹3.14L
- AOC date
- 15 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 15 Jun 23AOC date
- -Published
- -Closes
- -Bid opens
- 15 Jun 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 15/06/2023
- Authority
- Irrigation Department
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Irrigation Department has published Requirement Of Electrical Item At Rewari Store , Nhd Series 4 Pole Ac Controlcontactor, Size-1, 25A, Cat.-N0n Make Bch , Electronic Over Current Relay, Bocr-Ss-05, 0.5 To 6A, 320~480Vac Make Bch , Electronic Over Current Relay, Bocr-3De (Mp353de800b4), 0.5 To 60A, 320~480Vac Make Bch , Nhd Series 4 Pole Ac Control Contactor, Size-1, 40A, Cat.-N1n Make Bch , Pneumatic Timer Block, On/Off Delay Site Selectable, (C320tp2), 0.1 To 180 Sec. Make Bch , Pneumatic Timer, Krtpn10, 0~60 Sec., 01No+01Nc Make Bch , Contactor Ce 15Bns3, 9.1A,220V, 50Hz Make Bch , Led Street Light 70W/ 72W Make Havells / Halonix , Mccb, 250 Amp, 3 Pole, 36Ka Make Havells , Contactor Ce 15Bns3, 9.1A,415V, 50Hz Make Bch , Contactor Ce 15Bns3, 9.1A,220V, 50Hz Make Bch , Pneumatic Timer, Krtpcn11, 0~30 Sec., 415V, Max. 600V, 01No+01Nc Make Bch , Pneumatic Timer, Krtpcn11, 0~30 Sec., 220V,, 01No+01Nc Make Bch , Pvc Insulated Un-Armored 6Mm2, 3 Core Copper Cable Make Kei / Havells , Terms & Conditions:- 1. The Quoted Rate Will Be For F.O.R. Destination And Inclusive Of Gst And All Incidental Charges. Nothing Extra Shall Be Paid Separately. 2. Material Which To Be Supplied Should Be As Per Sample And Conforming To I.S. Specification. 3. Department Will Not Be Responsible For Non Submission Of Boq / Bid Document Online By Due Date, Due To Any Fault Of Internet/ E-Tendering. 4. Completion Period – Completion Period Is 30 Days. 5. The Bidder Must Create Their Contractor Id On Hew Portal (Http://Works.Haryana.Gov.In) And Accordingly Upload The Contractor Profile Summary In Bidding Documents, Failing Which The Bid Will Be Rejected. 6. 100% Payment Will Be Made On Receipt Of Material. 7. The Material Will Be Supplied Within The Period Prescribed In The Supply Order Failing Which Penalty Shall Be Imposed @ 0.5% Per Week On Approved Rates.. Last date of submission for this tender is 2023-05-05. This is a Mccb tender in Rewari, Haryana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free