🎉 Your free trial plan has started. Plan will expire in 0 days

Indian Oil Corporation Limited

panipat, haryana

AOC value
₹31K
AOC date
16 Oct
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 16 Oct 25AOC date

Important info

Result ID
Refer Docs
Award of contract
16/10/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Indian Oil Corporation Limited has published supply of Centrepipe And Outer Basket , List Of Item(S) / Work(S) As Per Tender Documents , Lower Outer Basket, 08-Rb-301 ; Regenerator Cylone Seperator Tag Number: 08-Rb-301 [F/ Mathura] ; Lower Outer Basket, 08-Rb-301 Drawing No. 630272-12 Make:- M/S Johnson Filteration System ; Supply Of Lower Outer Basket For Regenerator 08-Rb-301 As Per Attached Drawing No. 630272-12. Technical Notes: 1. Vendor Has To Supply Complete Lower Outer Basket Assembly As Per Drawing And Notes Mentioned In Drawing No. 630272-12. 2. Vendor Has To Furnish Material Test Certificate Against All Parts Of The Assembly At The Time Of Delivery Of The Material. 3. Vendor Has To Certify That The Supplied Lower Outer Basket Assembly Is Interchangeable With The Existing Lower Outer Basket Assembly Installed In 08-Rb-301 Of Ccru Unit. For This Purpose, Interchangeability Certificate Shall Be Supplied Along With The Material. 4. Vendor Has To Give Guarantee For The Supplied Material For A Period Of 12 Months From The Date Of Installation Or 18 Months From The Date Of Supply Which Ever Is Earlier Against Any Defect In Material, Manufacturing And Workmanship. , Upper Outer Basket:- 08-Rb-301 ; Regenerator Cylone Seperator Tag Number: 08-Rb-301 [F/ Mathura] ; Upper Outer Basket:- 08-Rb-301 Drawing No. 630272-11 Make:- M/S Johnson Filteration System ; Supply Of Upper Outer Basket For Regenerator 08-Rb-301 As Per Attached Drawing No. 630272-11 Technical Notes: 1. Vendor Has To Supply Complete Upper Outer Basket Assembly As Per Drawing And Notes Mentioned In Drawing No. 630272-11. 2. Vendor Has To Furnish Material Test Certificate Against All Parts Of The Assembly At The Time Of Delivery Of The Material. 3. Vendor Has To Certify That The Supplied Upper Outer Basket Assembly Is Interchangeable With The Existing Upper Outer Basket Assembly Installed In 08-Rb-301 Of Ccru Unit. For This Purpose, Interchangeability Certificate Shall Be Supplied Along With The Material. 4. Vendor Has To Give Guarantee For The Supplied Material For A Period Of 12 Months From The Date Of Installation Or 18 Months From The Date Of Supply Which Ever Is Earlier Against Any Defect In Material, Manufacturing And Workmanship. , Lower Centre Pipe,Regenerator ; Regenerator Cylone Seperator Tag Number: 08-Rb-301 [F/ Mathura] ; Lower Centre Pipe,Regenerator ; Supply Of Lower Centre Pipe Regenerator 08-Rb-301 As Per Attached Drawing No. D000588019 Rev A Technical Notes: 1. Vendor Has To Supply Complete Lower Centre Pipe Assembly As Per Drawing And Notes Mentioned In Drawing No. D000588019 Rev A. 2. Vendor Has To Furnish Material Test Certificate Against All Parts Of The Assembly At The Time Of Delivery Of The Material. 3. Vendor Has To Certify That The Supplied Lower Centre Pipe Assembly Is Interchangeable With The Existing Centre Pipe Assembly Installed In 08-Rb-301 Of Ccru Unit. For This Purpose, Interchangeability Certificate Shall Be Supplied Along With The Material. 4. Vendor Has To Give Guarantee For The Supplied Material For A Period Of 12 Months From The Date Of Installation Or 18 Months From The Date Of Supply Which Ever Is Earlier Against Any Defect In Material, Manufacturing And Workmanship. , Upper Centre Pipe,Regenerator ; Regenerator Cylone Seperator Tag Number: 08-Rb-301 [F/ Mathura] ; Upper Centre Pipe ; Supply Of Upper Centre Pipe Regenerator 08-Rb-301 As Per Attached Drawing No. 630272-9 Technical Notes: 1. Vendor Has To Supply Complete Upper Centre Pipe Assembly As Per Drawing And Notes Mentioned In Attached Drawing. 2. Vendor Has To Furnish Material Test Certificate Against All Parts Of The Assembly At The Time Of Delivery Of The Material. 3. Vendor Has To Certify That The Supplied Upper Centre Pipe Assembly Is Interchangeable With The Existing Centre Pipe Assembly Installed In 08-Rb-301 Of Ccru Unit. For This Purpose, Interchangeability Certificate Shall Be Supplied Along With The Material. 4. Vendor Has To Give Guarantee For The Supplied Material For A Period Of 12 Months From The Date Of Installation Or 18 Months From The Date Of Supply Which Ever Is Earlier Against Any Defect In Material.. Last date of submission for this tender is 2025-06-02. This is a Pipes tender in Panipat, Haryana

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

5 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in