🎉 Your free trial plan has started. Plan will expire in 0 days

Indian Oil Corporation Limited

panipat, haryana

AOC value
₹93.83L
AOC date
24 Dec
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 24 Dec 25AOC date

Important info

Result ID
Refer Docs
Award of contract
24/12/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Indian Oil Corporation Limited has published Supply Of Inconel And Monel- Pipes/ Fittings/ Flanges Supply Of Inconel And Monel- Pipes/ Fittings/ Flanges For P25 Project At Iocl Panipat Refinery , Supply Of Inconel/ Monel- Pipes As Per Material Requisition , Pipe,Efw,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 20, Efw, Plateshall Be Hot, Rolled Astm B443 Gr.1, Annealed, Weld Factor E = 1.00, Pipe B474 N06625 Gr1 Cl.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Monel, B36.19M, Bw Ends,Sch 40S, Seamless, Pipe B165 Uns N04400, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 20, Seamless, Annealed, B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 40S, Seamless, Annealed, B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 40S, Seamless, Annealed, B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Pe,Sch 40S, Seamless, Annealed, Pipe B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Pe,Sch 80S, Seamless, Annealed, Pipe B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Pe,Sch 80S, Seamless, Annealed, Pipe B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Supply Of Inconel/ Monel- Fittings As Per Material Requisition , Ecc Red,Inconel (H2 Ser.), B16.9, Bw Ends,Sch Non-Std, Lw,100% Radiography, Annealed, Weld Factor E = 1.00, B366 Gr.Wpncmc-Wx, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004, 3.Schedule Indicated Is For Higher Size , Rcpl,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Forged, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Tee,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Forged, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Hcpl,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Hcpl,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Nipple,Inconel,100Mm (H2 Ser.), B36.19M, Pe X Npt(M),Sch 80S, Seamless, Length = 100 Mm, Annealed, Nipple B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Nipple,Inconel,100Mm (H2 Ser.), B36.19M, Pe X Pe,Sch 80S, Seamless, Length = 100 Mm, Annealed, Nipple B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Elb,90 Deg,Lr,Monel, B16.9, Bw Ends,Sch 40S, Seamless, B366 Gr.Wpnc-S, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Elb,90 Deg,Inconel (H2 Ser.), B16.9, Bw Ends,Sch 20, Lw,100% Radiography, Lr, Annealed, Weld Factor E = 1.00, B366 Gr.Wpncmc-Wx, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Elb,45 Deg,Inconel (H2 Ser.), B16.9, Bw Ends,Sch 20, Lw,100% Radiography, Lr, Annealed, Weld Factor E = 1.00, B366 Gr.Wpncmc-Wx, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Supply Of Inconel/ Monel- Flanges As Per Material Requisition , Wn Flg,Monel, 300,0, B16.5, Bw Ends,Sch 40S,Rf, Flange B564 Uns N04400, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 20,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 20,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 40S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 40S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch Non-Std,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Bf,Inconel (H2 Ser.), 600,0, B16.5, Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Bf,Inconel (H2 Ser.), 600,0, B16.5, Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Bf,Inconel (H2 Ser.), 600,0, B16.5, Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Sw Flg,Inconel (H2 Ser.), 600,0, B16.5, Sw End,Sch 40S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Sw Flg,Inconel (H2 Ser.), 600,0, B16.5, Sw End,Sch 80S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Sw Flg,Inconel (H2 Ser.), 600,0, B16.5, Sw End,Sch 80S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004. Last date of submission for this tender is 2025-06-16. This is a Pipe And Tube Fittings tender in Panipat, Haryana

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

5 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in