Indian Oil Corporation Limited
- AOC value
- ₹93.83L
- AOC date
- 24 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 24 Dec 25AOC date
- -Published
- -Closes
- -Bid opens
- 24 Dec 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 24/12/2025
- Authority
- Indian Oil Corporation Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Indian Oil Corporation Limited has published Supply Of Inconel And Monel- Pipes/ Fittings/ Flanges Supply Of Inconel And Monel- Pipes/ Fittings/ Flanges For P25 Project At Iocl Panipat Refinery , Supply Of Inconel/ Monel- Pipes As Per Material Requisition , Pipe,Efw,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 20, Efw, Plateshall Be Hot, Rolled Astm B443 Gr.1, Annealed, Weld Factor E = 1.00, Pipe B474 N06625 Gr1 Cl.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Monel, B36.19M, Bw Ends,Sch 40S, Seamless, Pipe B165 Uns N04400, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 20, Seamless, Annealed, B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 40S, Seamless, Annealed, B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Bw Ends,Sch 40S, Seamless, Annealed, B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Pe,Sch 40S, Seamless, Annealed, Pipe B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Pe,Sch 80S, Seamless, Annealed, Pipe B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Inconel (H2 Ser.), B36.19M, Pe,Sch 80S, Seamless, Annealed, Pipe B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Supply Of Inconel/ Monel- Fittings As Per Material Requisition , Ecc Red,Inconel (H2 Ser.), B16.9, Bw Ends,Sch Non-Std, Lw,100% Radiography, Annealed, Weld Factor E = 1.00, B366 Gr.Wpncmc-Wx, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004, 3.Schedule Indicated Is For Higher Size , Rcpl,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Forged, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Tee,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Forged, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Hcpl,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Hcpl,Inconel (H2 Ser.), 3000,0, B16.11, Sw Ends, Annealed, B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Nipple,Inconel,100Mm (H2 Ser.), B36.19M, Pe X Npt(M),Sch 80S, Seamless, Length = 100 Mm, Annealed, Nipple B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Nipple,Inconel,100Mm (H2 Ser.), B36.19M, Pe X Pe,Sch 80S, Seamless, Length = 100 Mm, Annealed, Nipple B444 Uns N06625 Gr.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Elb,90 Deg,Lr,Monel, B16.9, Bw Ends,Sch 40S, Seamless, B366 Gr.Wpnc-S, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Elb,90 Deg,Inconel (H2 Ser.), B16.9, Bw Ends,Sch 20, Lw,100% Radiography, Lr, Annealed, Weld Factor E = 1.00, B366 Gr.Wpncmc-Wx, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Elb,45 Deg,Inconel (H2 Ser.), B16.9, Bw Ends,Sch 20, Lw,100% Radiography, Lr, Annealed, Weld Factor E = 1.00, B366 Gr.Wpncmc-Wx, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Supply Of Inconel/ Monel- Flanges As Per Material Requisition , Wn Flg,Monel, 300,0, B16.5, Bw Ends,Sch 40S,Rf, Flange B564 Uns N04400, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 20,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 20,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 40S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch 40S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Wn Flg,Inconel (H2 Ser.), 600,0, B16.5, Bw Ends,Sch Non-Std,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Bf,Inconel (H2 Ser.), 600,0, B16.5, Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Bf,Inconel (H2 Ser.), 600,0, B16.5, Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Bf,Inconel (H2 Ser.), 600,0, B16.5, Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Sw Flg,Inconel (H2 Ser.), 600,0, B16.5, Sw End,Sch 40S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Sw Flg,Inconel (H2 Ser.), 600,0, B16.5, Sw End,Sch 80S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Sw Flg,Inconel (H2 Ser.), 600,0, B16.5, Sw End,Sch 80S,Rf, Annealed, Flange B564 Uns N06625, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004. Last date of submission for this tender is 2025-06-16. This is a Pipe And Tube Fittings tender in Panipat, Haryana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free