Indian Oil Corporation Limited
- AOC value
- ₹6.8Cr
- AOC date
- 29 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 29 Aug 25AOC date
- -Published
- -Closes
- -Bid opens
- 29 Aug 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 29/08/2025
- Authority
- Indian Oil Corporation Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Indian Oil Corporation Limited has published Supply Of Pipes-Cs (Seamless) Supply Of Pipes-Cs (Seamless)For P25 Project At Iocl Panipat Refinery , Supply Of Pipe/Tube-C S (Seamless)To Astm Stds , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch 80, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch 120, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs, B36.10M, Bw Ends,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Nace+H2), B36.10M, Bw Ends,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Bw Ends,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace), B36.10M, Bw Ends,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Galv.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Std, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch 80, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch 80, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs, B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace), B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs, B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs, B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (H2 Ser.), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs (Nace), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005 , Pipe,Smls,Cs, B36.10M, Pe,Sch Xxs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch Xxs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch Xxs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Nace+H2), B36.10M, Pe,Sch Xxs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Nace Req. Acc. To Nace Mr-0103, And Doc. 6745-Pip-000-Ec-0005, 3.Additional Requirements For H2 Service, Acc. To Doc. 6745-Pip-000-Ec-0004 , Pipe,Smls,Cs (Ibr), B36.10M, Pe,Sch Xs, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Ibr), B36.10M, Pe,Sch 160, Seamless, Pipe A106 Gr.B, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001, 2.Ibr Certificate In Form Iiia Required , Pipe,Smls,Cs (Galv.), B36.10M, Scrd Npt(M),Sch Std,B1.20.1, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Scrd Npt(M),Sch Std,B1.20.1, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Scrd Npt(M),Sch Xs,B1.20.1, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Scrd Npt(M),Sch Xs,B1.20.1, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Scrd Npt(M),Sch Xs,B1.20.1, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Scrd Npt(M),Sch 160,B1.20.1, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Cs (Galv.), B36.10M, Scrd Npt(M),Sch 160,B1.20.1, Seamless, Pipe A106 Gr.B (Galv.), Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Ltcs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A333 Gr.6, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Ltcs, B36.10M, Bw Ends,Sch Std, Seamless, Pipe A333 Gr.6, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Ltcs, B36.10M, Bw Ends,Sch Xs, Seamless, Pipe A333 Gr.6, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Smls,Ltcs, B36.10M, Pe,Sch Xs, Seamless, Pipe A333 Gr.6, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 => Limited. Last date of submission for this tender is 2024-07-15. This is a Seamless Pipe tender in Panipat, Haryana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free