Engineers India Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Engineers India Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Engineers India Limited has published Tender For Variable Area Flow meters (Indicators And Transmitters) For Bcpl, Variable Area Flowmeters (Indicators And Transmitters) For Bcpl , Bidder To List Along With Quotation For Two Years Operation And Maintenance Spares, As Per Vendor Recommendation. Separate List Shall Be Provided By The Bidder For Each Item/Group In The Format Enclosed Herewith With Itemized Cost. Ordering Of These Spares May Be Done By The Purchaser Separately On A Later Date And Not Along With Main Equipment.The Price Of Two Years Operation And Maintenance Spares Shall Not Be Considered For Commercial (Price) Evaluation Of The Bid. , Bidder To Note That Technical Loading, If Any, Shall Be As Per Loading Criteria Specified In The Mr And The Same Shall Be Considered For Evaluation. Hence, Bidder Shall Quote The Guaranteed Power Consumption For The Compressor Quoted As Per Format-A6 In Price Bid. , The Inspection And Testing Charges Shall Be Considered In Line With Scc-Goods And Its Amendment, If Any. , Bidder Shall Furnish The Break-Up Of Built-In Cif Value Against Each Quoted Item, Giving Details Of Description Of Goods, Qty. Rate Of Custom Duty Etc. In Attached Cif Format-A8 , In Case Of Discrepancies In The Item Description/Quantity/Tag No. In This Sop, Description/Quantity/Tag No. Etc As Per Mr Item Sl. No. Shall Prevail. , Bidder Must Quote For Each Item(S) In A Group(S) As Per Boq. Bidder To Note That The Evaluation And Ordering Shall Be Done On Group Wise Lowest Evaluated Price (L-1) Basis And In Case Bidder Does Not Quote Or Quotes Zero For Any Item(S) In A Group(S) Then Bidder Shall Not Be Considered For Evaluation And Ordering Of That Particular Group. Unit Rate(S) Quoted Against Each Item(S) In Boq Shall Be Considered As Unit Rates Of Item(S) For Addition/Deletion Purpose, As Per Mr. , This Schedule Of Prices Comprises The Following : - Schedule Of Prices ( Format-A) - Supply Of Two Years Operation & Maintenance Spares As Per Mr (Format-A1) - Details Of Built-In-Cif Value Of Import Content (Raw Materials) (Format-A8) - Bid Details And Gst Details (Format-A9) , I) Bidders Must Submit This Preamble With Their Bid With Both Unpriced & Priced Offer. Ii) Bidders Are Requested To Enter Their Name In The Each Page Of Excel File / Pdf File Of Schedule Of Price Provided In The E-Tender Portal For Submission Of Unpriced & Price Bid => Limited. Last date of submission for this tender is 2025-10-31. This is a Flowmeters tender in Gurgaon, Haryana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
2 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free