Command Area Development Authority
- AOC value
- ₹65L
- AOC date
- 19 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 19 May 26AOC date
- -Published
- -Closes
- -Bid opens
- 19 May 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 19/05/2026
- Authority
- Command Area Development Authority
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Command Area Development Authority has published Tender for Supply Carriage And Laying Of 100 Micron Polythene Under Bed Lining Watercourse , Supply, Carriage And Fixing Of Reinforced Cement Concrete Panels Of Requisite Size As Per Approved Design Drawing And P.W.D. Specifications (33 X 33) , Supply, Carriage And Fixing Of Reinforced Cement Concrete Lids Dia 27 , Civil Work , Hsr Item 4.12.1-Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Up To 50 M And Lift Up To 1.5 M, As Directed By Engineerin-Charge. 1. All Kinds Of Soil Hsr Rate(Rs.) 78.00 Through Rate , Hsr Item 4.33-Excavating, Supplying And Filling Of Local Earth (Including Royalty) By Mechanical Transport Up To A Lead Of 1 Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Trenches, Plinth, Sides Of Foundation Etc. Complete. Hsr Rate(Rs.) 138.00 Through Rate , [14.1]Dressing Bed And Preparation Of Sub Grade For Lining By Mechanical/ Mannual Means Hsr Rate (Rs.) 4.00 Labour Rate , Hsr Item 6.1.6-Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (Zone-Iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size) Hsr Rate(Rs.) 2442.00 Through Rate , Hsr Item 7.21.1-Brick Work With Common Burnt Clay Nonmodular Bricks Of Class Designation 10.5 In Foundation And Plinth In: 1. Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) Hsr Rate(Rs.) 4128.00 Through Rate , [11.8.1]12 Mm Cement Plaster Of Mix : 1. 1:4 (1 Cement: 4 Coarse Sand) Hsr Rate (Rs.) 114.00 Through Rate , [7.65]Extra For Specially Moulded Brick Work In Circular Work Such As Wells, Shafts, Circular Sumps, Pumps Chambers, Etc. In Which Specially Moulded Or Cut-Bricks Have To Be Used: But For Which No Centring Or Supports Are Required Up To 4.5 Metres Internal Diameter. Hsr Rate (Rs.) 131.00 Through Rate , [4.32] Filling Available Excavated Earth (Excluding Rock) In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Up To 1.5 M. Hsr Rate(Rs.) 46.00 Through Rate. Last date of submission for this tender is 2026-04-07. This is a Water Course tender in Hisar, Haryana
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free