Western Railway
Important Info
AOC Description
Western Railway has published Supply Of Hydraulic Re-Railing Equipment As Listed Belowhydraulic Re-Railing Equipment As Listed Below,Supply, Installation And Commissioning Of Complete Set Of Hydraulic Rerailing Equipments (H Re) Along With Its All Concomitant Accessories As Per Attached Technical Specifications_Udn & Additional Sp Are Set Of Spare Of Same Make As Per Annexure-A In Technical Specifications_Udn Attached Below. [ Warra Nty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation And Commissioning Of Hydraulic Re-Railing Equipment (Hre) As Per Tech Nical Specifications_Gim Attached Below. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation And Commissioning Of Hydraulic Re-Railing Equipment (Hre) As Per Tech Nical Specifications_Ndb Attached Below [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation And Commissioning Of Hydraulic Re-Railing Equipment (Hre) As Per Tech Nical Specifications_Sbi Attached Below [ Warranty Period: 30 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2026-01-21. This is a Railing Work tender in Surat, Gujarat
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

