Western Railway
Important Info
AOC Description
Western Railway has published Supply Of xen items , concrete stud finder [ warranty period: 30 months after the date of delivery ] ] , laser distance meter digital [ warranty period: 30 months after the date of delivery ] ] , spatula (wooden handle)(12 inch) [ warranty period: 30 months after the date of deliver y ] ] , rodometer (analog) [ warranty period: 30 months after the date of delivery ] ] , digital vernier calliper , range : 0 - 150 mm [ warranty period: 30 months after the d ate of delivery ] ] , core cutter hammer [ warranty period: 30 months after the date of delivery ] ] , concrete rebound hammer [ warranty period: 30 months after the date of delivery ] ] , coating thickness gauge [ warranty period: 30 months after the date of delivery ] ] , digital vernier calliper (0 to 300 mm) [ warranty period: 30 months after the date of delivery ] ] , core cutter dolly with rammer [ warranty period: 30 months after the date of delivery ] ] , soil moisture meter kit [ warranty period: 30 months after the date of delivery ] ] , digital weighing balance (cap 20 kg / lc 1 gm) (eco mini) [ warranty period: 30 months af ter the date of delivery ] ] , gi tray (12 inch x 10 inch) [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-09-22. This is a Bolts tender in null, Gujarat
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

