Western Railway
Important Info
AOC Description
Western Railway has published Supply Of Solder Wiresolder Wire,Supply Of Soldering Iron 65 Watt/220V. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of Soldering Iron 10W/12V. [ Warranty Period: 30 Months After The Date Of Deliver Y ] ] , Supply Of Soldering Iron 25 Watt/220V [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of Solder Wire 60/40 (Sn/Pb) 18 Swg Or 1.2Mm Dia With 2.2% Flux (In 500Gm Packing). Ma Ke: Eyre/Cookson/Joint Green Label/Khosala. [ Warranty Period: 30 Months After The Date Of Delivery ] ] Page 1 Of 5 Run Date/Time: 02/09/2024 17:12:55Brc-Div/Western Rly Tender Document , Supply Of Solder Wire 60/40 (Sn/Pb) 18 Swg Or 1.2Mm Dia With 2.2% Flux (In 500Gm Packing). [ W Arranty Period: 30 Months After The Date Of Delivery ] ] Sr. Section Engineer Gujarat 1.00 Kg , Supply Of Solder Wire 60/40 (Sn/Pb) 18 Swg Or 1.2Mm Dia With 2.2% Flux (In 500Gm Packing). M Ake: Eyre/Cookson/Joint Green Label/Khosala. [ Warranty Period: 30 Months After The Date Of Delivery ] ] Sr. Section Engineer Gujarat 10.00 Kg , Supply Of Solder Wire 60/40 (Sn/Pb) 18 Swg Or 1.2Mm Dia With 2.2% Flux (In 500Gm Packing). Ma Ke: Eyre/Cookson/Joint Green Label/Khosala. [ Warranty Period: 30 Months After The Date Of Delivery ] ] Sr. Section Engineer Gujarat 2.00 Kg , Supply Of Solder Wire 60/40 (Sn/Pb) 18 Swg Or 1.2Mm Dia With 2.2% Flux (In 500Gm Packing). Ma Ke: Eyre/Cookson/Joint Green Label/Khosala. [ Warranty Period: 30 Months After The Date Of Delivery ] ] Sr. Section Engineer Gujarat 2.00 Kg , Supply Of Solder Wire 60/40 (Sn/Pb) 18 Swg Or 1.2Mm Dia With 2.2% Flux (In 500Gm Packing). M Ake: Eyre/Cookson/Joint Green Label/Khosala. [ Warranty Period: 30 Months After The Date Of Delivery ] ] Sr. Section Engineer Gujarat 3.00 Kg , Supply Of Solder Wire 60% Tin, 40% Lead (Roll Of 250 Gms).Sample Should Be Approved Before Supply ] Sr. Section Engineer Gujarat 3.00 Kg , Supply Of Rosin Core For Soldering 1.2Mm Dia [ Warranty Period: 30 Months After Th E Date Of Delivery ] ] Sr. Section Engineer Gujarat 1.00 Kg. Last date of submission for this tender is 2024-09-16. This is a Soldering And Welding Machinery tender in null, Gujarat
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

