Western Railway
Important Info
AOC Description
Western Railway has published Supply Of Thick Web Switch Rail Point Clampsthick Web Switch Rail Point Clamps,Thick Web Switch Rail Point Clamps Planning For Laying Of Thick Web Switch At Ltr:02, Brgp: 02, Sr:01, Dl:01 Planned I N Oct-25 , Brgp :02, Ltr:02,Lxr:01,Wkr:01,Rjt:02,Okd-1 In Nov-25, Brgp :02, Ltr:02,Wkr:02,Rjt:02 In Dec-25. Brgp :02, Ltr:02,W Kr:01,Rjt:02, Jam-2 In Jan -26. Brgp :02, Ltr:03,Than:01,Rjt:02, Bhta-4,In Feb -26. Ltr : 02,Brgp:02,Than:01,Rjt:02 , Bhta-4 In Mar -26. Accordingly Total Number Of Points : 55 . Point Clamps Required : 55X 2 = 110. Note : 08 Points I.E Than :02,Dl:01,Vd:01 . Total : 0 8 For Which Spare Point Clamps Not Provided By Engineering Department. Spare Required : 40 ( To Meet With Any Damage If Occurred To Point Clamps) So, Number Of Tws Clamps Required Including Spare : 150. [ Warranty Period: 30 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2026-01-15. This is a Switch Supply tender in Rajkot, Gujarat
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

