Institute For Plasma Research
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Institute For Plasma Research
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Institute For Plasma Research has published Phase-2 - Driver And Final Stage Amplifiers For 2 Sets Of Phase-2 - Driver And Final Stage Amplifiers For 2 Sets Of Iter Icrf Sources , Hpa2 Cavity Parts: Refer Table 3 Of Part-A(Ii) , Hpa3 Cavity Parts: Refer Table 3 Of Part-A(Ii) , Line Stretcher (Trombone) In Between Hpa2 And Hpa3 Refer Table 3 Of Part-A(Ii) , Custom-Built Items As Per Table B1 And Table B2 Of Part-A (Ii) . Refer Table 3 Of Part-A(Ii) , Hardware Along With Connectors And Cables Refer Table 3 Of Part-A(Ii) , Water- & Air-Cooling Distribution System. Refer Table 3 Of Part-A(Ii) , Factory Acceptance Test (Fat) As Per Condition For Acceptance , High Power Tubes For Hpa2 Refer Table 3 Of Part-A(Ii) , High Power Tubes For Hpa3 , High Power Tube For Hpa2 (Spare) Refer Table 3 Of Part-A(Ii) , High Power Tube For Hpa3 (Spare) Refer Table 3 Of Part-A(Ii) , High Power Tubes For Hpa2 , High Power Tubes For Hpa3 , Assembly & Integration Of Newly Supplied Components At Iter-India Site , Low Power And High-Power Rf Testing Of Rf Chains On Matched Load At Iter-India Site , High-Power Rf Testing Of Rf Chains On Mis-Matched Load At Iter-India Site , Water- & Air-Cooling Distribution System. Refer Table 3 Of Part-A(Ii) , Additional Components Required To Modifyphase 1 Including Components As Per Section 15.1 Under Annexure-F: Hardware To Be Delivered By Bidder To Interface With Lcu Refer Table 3 Of Part-A(Ii) , Assembly & Integration Of Existing Components Already Supplied During Phase 1 At Iter-India Site , Low Power And High-Power Rf Testing Of Existing Components Already Supplied During Phase 1 On Matched Load At Iter-India Site , High-Power Rf Testing Of Existing Components Already Supplied During Phase 1 On Mis-Matched Load At Iter-India Site , Documentation Up To Closing Of Mrr , Assembly, Integration And Testing Of Newly Components At Io Site On Matched Load , Assembly, Integration And Testing Of Newly Components At Io Site On Mis-Matched Load , Assembly, Integration And Testing Of Existing Components Already Supplied During Phase 1 At Io Site On Matched Load , Assembly, Integration And Testing Of Existing Components Already Supplied During Phase 1 At Io Site On Mis-Matched Load , Documentation Up To Closing Of Contract From Sat At Io , Custom Built Items For Hpa2 As Per Table B1. Refer Table 4 Of Part-A(Ii) , High Power Tube For Hpa2.Refer Table 4 Of Part-A(Ii). Last date of submission for this tender is 2025-08-05. This is a Amplifiers Supply tender in Ahmedabad, Gujarat
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free