🎉 Your free trial plan has started. Plan will expire in 0 days

Institute For Plasma Research

ahmedabad, gujarat

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Institute For Plasma Research has published Phase-2 - Driver And Final Stage Amplifiers For 2 Sets Of Phase-2 - Driver And Final Stage Amplifiers For 2 Sets Of Iter Icrf Sources , Hpa2 Cavity Parts: Refer Table 3 Of Part-A(Ii) , Hpa3 Cavity Parts: Refer Table 3 Of Part-A(Ii) , Line Stretcher (Trombone) In Between Hpa2 And Hpa3 Refer Table 3 Of Part-A(Ii) , Custom-Built Items As Per Table B1 And Table B2 Of Part-A (Ii) . Refer Table 3 Of Part-A(Ii) , Hardware Along With Connectors And Cables Refer Table 3 Of Part-A(Ii) , Water- & Air-Cooling Distribution System. Refer Table 3 Of Part-A(Ii) , Factory Acceptance Test (Fat) As Per Condition For Acceptance , High Power Tubes For Hpa2 Refer Table 3 Of Part-A(Ii) , High Power Tubes For Hpa3 , High Power Tube For Hpa2 (Spare) Refer Table 3 Of Part-A(Ii) , High Power Tube For Hpa3 (Spare) Refer Table 3 Of Part-A(Ii) , High Power Tubes For Hpa2 , High Power Tubes For Hpa3 , Assembly & Integration Of Newly Supplied Components At Iter-India Site , Low Power And High-Power Rf Testing Of Rf Chains On Matched Load At Iter-India Site , High-Power Rf Testing Of Rf Chains On Mis-Matched Load At Iter-India Site , Water- & Air-Cooling Distribution System. Refer Table 3 Of Part-A(Ii) , Additional Components Required To Modifyphase 1 Including Components As Per Section 15.1 Under Annexure-F: Hardware To Be Delivered By Bidder To Interface With Lcu Refer Table 3 Of Part-A(Ii) , Assembly & Integration Of Existing Components Already Supplied During Phase 1 At Iter-India Site , Low Power And High-Power Rf Testing Of Existing Components Already Supplied During Phase 1 On Matched Load At Iter-India Site , High-Power Rf Testing Of Existing Components Already Supplied During Phase 1 On Mis-Matched Load At Iter-India Site , Documentation Up To Closing Of Mrr , Assembly, Integration And Testing Of Newly Components At Io Site On Matched Load , Assembly, Integration And Testing Of Newly Components At Io Site On Mis-Matched Load , Assembly, Integration And Testing Of Existing Components Already Supplied During Phase 1 At Io Site On Matched Load , Assembly, Integration And Testing Of Existing Components Already Supplied During Phase 1 At Io Site On Mis-Matched Load , Documentation Up To Closing Of Contract From Sat At Io , Custom Built Items For Hpa2 As Per Table B1. Refer Table 4 Of Part-A(Ii) , High Power Tube For Hpa2.Refer Table 4 Of Part-A(Ii). Last date of submission for this tender is 2025-08-05. This is a Amplifiers Supply tender in Ahmedabad, Gujarat

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in