🎉 Your free trial plan has started. Plan will expire in 0 days

Northern Railway

delhi, delhi

AOC value
₹7.68L
AOC date
1 Dec
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 1 Dec 23AOC date

Important info

Result ID
Refer Docs
Award of contract
01/12/2023
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Northern Railway has published Procurement Of Ips, Supply Of Ips As Per Rdso Drg. No. Sdo / Ips / Pi / 6L / Re / 004 And Commissioning Of Ips As Per Rdso Letter No. Sts / E / Ips / Gen. Dt. 03.04.2008 As Per Rdso Spec. No. Rdso / Spn / 165 / 2012 Ver.-3.0 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply & Commissioning Of Ips As Per Rdso / Spn / 165 / 2012, Ver.3.0. Or Latest Amendment As Per Drg Enclosed With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Smps Based Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Of South Zone In Mb Yard Along With Lmla Battery Bank Of 110V / 200Ah & Battery Rack. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply & Commissioning Of Ips As Per Rdso / Spn / 165 / 2012, Ver.3.0 Or Latest Amendment And As Per Drawing Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply & Commissioning Of Ips As Per Rdso Spn / 165 / 2012 Ver.3 Or Latest Amendment As Per Rdso Drg.No Sdo / Ips / P1-6L / Re / 004 Attached [ Warranty Period: 30 Months After The Date Of Delivery ] Senior Section Engineer / Signal / Dkz , Delhi 11.00 Set , Supply, Installation And Commissioning Of Smps Based Integrated Power Supply ( Ips ) For Interlocked Lc Gate In Re Area Confirming To Rdso Specification No Rdso / Spn / 165 / 2012 Ver 3.0 Str No - Siq 0110 Ver 3.0 As Per Scheme Attached. It Includes Supply Of 2V / 200Ah Vrla Maintenance Free Cells As Per Irs: S 93 / 96 ( A ) For Bank Of 110Volts. Undertaking Regarding Use Of Battery Grade Acid As Per Is:266:1993 & De- Mineralised / Distilled Water As Per Is 1069:1993 For Initial Charging Shall Be Given. Multi Strand Copper Cable Of 16 Sq Mm As Per Irs: S 76-89 / Is: 694 & Grade 1100 V For Connecting Ips To Battery Bank Shall Be Supplied. Distance Between Ips And Battery Bank Is 20 Mts. A Tool Kit Containing Tools As Per List Attached Shall Be Supplied In A Suitable Bag. An Exhaust Fan Of 12 Inch Size ( Min ) Shall Be Supplied. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Smps Based Integrated Power Supply System ( Ips ) In Re Section As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest Along With Lmla Battery Bank Of 110V / 200Ah As Per Drg No. Sdo / Ips / Pi-4L / Re / 002 Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Smps Based Integrated Power Supply ( Ips ) For Interlocked Lc Gate In Re Area Confirming To Rdso Spn No Rdso / Spn / 165 / 2012 Ver 3.0 Str No: Siq 0110 Ver 3.0 As Per Scheme Attached. It Includes Supply Of 2V / 200Ah Lmla Maintenence Free Cells As Per Irs:S 93 / 96A For Banks Of 110 Volts. Undertaking Regarding Use Of Battery Grade Acid As Per Is:266:1993 & Demineralised / Distill Water As Per Is 1069;1993 For Initial Charging Shall Be Given. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply And Commissioning Of Ips As Per Rdso Spec. No.Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest Amdt. And As Per Drawing Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply And Commissioning Of Ips As Per Rdso Specn. No. Rdso / Spn / 165 / 2012 Ver. 3.0 Or Latest Amendment And Drg. Enclosed. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Rh4 In Mb Yard Without Battery Bank. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Smps Based Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Of Power Cabin In Mb Yard Along With Lmla Battery Bank Of 110V / 200Ah & Battery Rack. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Rh5 In Mb Yard Along With 110V / 200Ah Lmla Battery Bank. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Smps Based Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Of North Zone In Mb Yard Along With Lmla Battery Bank Of 110V / 200Ah & Battery Rack. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Rh2 In Mb Yard Along With 110V / 200Ah Lmla Battery Bank. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Rh1 In Mb Yard Along With 110V / 200Ah Lmla Battery Bank. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation & Commissioning Of Integrated Power Supply ( Ips ) As Per Rdso Specification No. Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Drg. No. Rh7 In Mb Yard Along With 110V / 200Ah Lmla Battery Bank. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply Of Ips As Per Spec- Rdso / Spn / 165 / 2012 Ver. 3.0 Or Latest And Commissioning As Per Letter Sts / E / Ips / Genl. Dated 03.04.2000 Or Latest Amendment As Per Drg. Attached With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation And Commissioning Of Ips As Per Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest Amendment And As Per Drg Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation And Commissioning Of Ips As Per Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest Amendment And As Per Drg Attached [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation And Commissioning Of Ips As Per Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest Amendment And As Per Drg Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply And Commissioning Of Ips As Per Rdso / Spn / 165 / 2012Ver.3.0 Or Latest Amendment And As Per Drg. Enclosed And Commissioning Of Ips As Per Rdsos Letter No. Sts / E / Ips / Genl.Dt.03.04.2008 ) [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply & Commissioning Of Ips As Per Rdso / Spn / 165 / 2012, Ver.3.0. Or Latest Amendment And As Per Drg. Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Installation And Commissioning Of Ips As Per Rdso / Spn165 / 2012 Ver.3.0 Or Latest Amendment As Per Drg Sdo / Ips / Lc / 007 Attached With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply And Commissioning Of Ips As Per Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest Amendment And As Per Drg Attached With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] Senior Section Engineer / Const / S / Nno , Delhi 2.00 Set , Supply And Commissioning Of Ips As Per Rdso / Spn / 165 / 2012 / Ver3.0 Or Latest Amendment And As Per Drg Attached With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] Senior Section Engineer / Const / S / Nno , Delhi 2.00 Set , Supply , Installation, Testing And Commissioning Of Smps Based Integrated Power Supply System ( Ips ) As Per Rdso Spn No. Rdso / Spn / 165 / 2012 With Latest Amdt Along With 300 Ah Lmla Battery Set ( Consisting Of 55 Plus 5 Cell As Per Rdso Spn No Irs:S 88 / 2004 With Latest Amdt ) For Re Area With Sketch No Sdo / Ips / Pi6i / Re / 004 For Upto 6 Line Station. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply, Commissioning & Testing Of Ips As Per Rdso / Spn / 165 / 2012 / Version 3.0 Drawing No Sdo / Ips / Pi-4L / Re / 002 Attached With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply Of Ips As Per Spec-Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Commissioning As Per Letter Sts / E / Ips / Genl. Dated 03-04-2000 Or Latest Amendment As Per Drg. Attached With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply Of Ips As Per Spec-Rdso / Spn / 165 / 2012 Ver.3.0 Or Latest And Commissioning As Per Letter Sts / E / Ips / Genl. Dated 03-04-2000 Or Latest Amendment As Per Drg. Attached With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] Chief Signal Inspector ( E ) / Faizabad , Uttar Pradesh 11.00 Set , Supply And Commissioning Of Ips As Per Rdso / Spn / 165 / 2012Ver.3.0 Or Latest Amendment And As Per Drg. Enclosed And Commissioning Of Ips As Per Rdsos Letter No.Sts / E / Ips / Genl. Dated:03.04.2008 [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply Of Smps Based Mini Integrated Power Supply System As Per Rdso Spec No. Rdso / Spn / 165 / 2012 Ver. 3.0 Or Latest Amendment As Per Guide Line Of Rdso, Along With 110 V Low Maintenance Batteries, Surge Protection Devices Including Commissioning Of Ips As Per Rdso Letter No- Sts / E / Ips / Genl Dt-03.04.2008. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply And Commissioning If Ips As Per Rdso / Spn / 165 / 2012Ver.3.0 Or Latest Amendment And As Per Drg.Enclosed And Commissioning Of Ips As Per Rdsos Letter No. Sts / E / Ips / Genl. Dt.03.0402008 [ Warranty Period: 30 Months After The Date Of Delivery ] Page 5 Of 13 Run Date / Time: 12 / 05 / 2023 13:43:38Stores / Northern Rly Tender Document , Supply & Commissioning Of Ips As Per Rdso / Spn / 165 / 2012, Ver.3.0. Or Latest Amendment As Per Drg Enclosed With The Tender. [ Warranty Period: 30 Months After The Date Of Delivery ] , Mini Integrated Power Supply System As Per Rdso Spec No Rdso / Spn / 165 / 2012 Ver 3.0 Or Latest Amendment. As Per Guide Lines Of Rdso Along With 110 V Low Maintenance Batteries, Surge Protection Devices. Commissioning Of Ips As Per Rdso Letter No-Sts / E / Ips / Genl Dated 3 / 4 / 2008 [ Warranty Period: 30 Months After The Date Of Delivery ] . Last date of submission for this tender is 2023-06-21. This is a Railway Ancillaries tender in Delhi, Delhi

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in