Northern Railway
Important Info
AOC Description
Northern Railway has published Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Page 1 Of 6 Run Date / Time: 27 / 09 / 2023 19:41:55Stores / Northern Rly Tender Document , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Sr. Section Punjab 123.00 Set , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Senior Section Uttar Pradesh 25.00 Set Engr. / Charbagh , Nr , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] Senior Section Engg / Train Haryana 250.00 Set , Supply And Installation Of Aerosol Based Fire Detection And Suppression System Cartridge 100Gm + 100Gm, Total 2 Pieces Per Coach Sbc, Technical Requirement As Per Annexure G-1 Of Rdso Specification No. Rrdso / Pe / Spec / Ac / 0192-2018 ( Rev-1 ) And Rdso Letter No. El / 7.1.108 / Mssbc Dated 17.09.2021. These Shall Be Installed In Already Available Sbc Of Lhb Ac Coaches. All Necessary Modification, Clamping Arrangement And Any Other Accessories Required For Installation Of This Item Shall Be With The Scope Of Supplier. Location Of Installation Of Aerosol Based Fire Detection And Suppression System Cartridge In Sbc Shall Be As Per Drawing Mentioned In The Rdso Letter No. El / 7.1.108 / Sbc Dated 07.02.2023 [ Warranty Period: 120 Months After The Date Of Delivery ] . Last date of submission for this tender is 2023-10-30. This is a Flame Detectors tender in Delhi, Delhi
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

