🎉 Your free trial plan has started. Plan will expire in 0 days

Delhi Metro Rail Corporation Limited

Agricultural Product And Services
delhi, delhi
AOC Value₹6.1 Cr
AOC Date27 Aug 2026
Completion DaysRefer Docs
Bid AmountRefer Docs

Important Info

Result ID
Refer Docs
Award of Contract
27/08/2026
Authority
Delhi Metro Rail Corporation Limited
Published Date
Refer Docs
Tender Closing Date
Refer Docs
Tender No
55(00)/2025-2026/XXX/5XX
Bidding URL
https://www.exampletenders.gov.in/bid/98765
Tender
View Tender
Bidder Details
Bidder Name: Mr. Jhon Doe, Ranking 2

AOC Description

Delhi Metro Rail Corporation Limited has published Tender For Miscellaneous Civil Works From Saket-G To Sangam Vihar For Timely Construction Of Various Interface Activities To Assist Rod Timelines - Dsr 2023 Items For Civil Work Schedule-Bndsr Items - Civil Works Schedule-Bndsr Items - Structure Steel Works Dsr 2025-Horticulture Work Dsr 2025-Electrical Work Name Of Work:Miscellaneous Civil Works From Saket-G To Sangam Vihar For Timely Construction Of Various Interface Activities To Assist Rod Timelines Bill Of Quantities Preamble S. No. Description The Bill Of Quantities Shall Be Read In Conjunction With Instructions To Tenderers, Form Of Tender, General And Special Conditionsof Contract. Notice Inviting Tender, Technical Specifications, Employer’S Requirements Including Appendices, Conditions Of Contract On Safety & Health And Environment, Tender Drawings And Geotechnical Investigation Reports. Contractor Before Quoting The Rate Shall Carefully Read Key Dates As Mentioned In EmployerS Requirement -Appendix - 2B. Schedule ‘A ’ Consists Of Dsr (Civil) 2023 Items , The Tenderer Has To Quote Percentage Above/Below/At Par Rates Against Schedule A. The Payment Against This Head Will Be Made On The Basis Of Quantities Executed, Measured And Certified And As Per The Direction Of The Engineer-In-Charge.In Case Of Any Discrepancy In The Description Of Items, The Description As Mentioned In The Dsr Published By Cpwd Shall Prevail. All Dsr Items Should Be Read In Conjuction With Latest Cpwd Specifications. Schedule B1 & B2 Consists Of Non-Scheduled Items For Civil Work. The Tenderer Has To Quote Percentage Above/Below/At Par Against Schedule-B1 & B2. The Payment Against This Head Will Be Made On The Basis Of Quantities Executed, Measured And Certified And As Per The Direction Of The Engineer-In-Charge. Schedule ‘C ’ Dsr 2025 - Horticulture & Landscaping Items. The Tenderer Has To Quote Percentage Above/Below/At Par Rates Against Schedule C. The Payment Against This Head Will Be Made On The Basis Of Quantities Executed, Measured And Certified And As Per The Direction Of The Engineer-In-Charge.In Case Of Any Discrepancy In The Description Of Items, The Description As Mentioned In The Dsr Published By Cpwd Shall Prevail. All Dsr Items Should Be Read In Conjuction With Latest Cpwd Specifications. Schedule ‘D ’ Consists Of Dsr (E&M) 2025 Items. The Tenderer Has To Quote Percentage Above/Below/At Par Rates Against Schedule E. The Payment Against This Head Will Be Made On The Basis Of Quantities Executed, Measured And Certified And As Per The Direction Of The Engineer-In-Charge.In Case Of Any Discrepancy In The Description Of Items, The Description As Mentioned In The Dsr Published By Cpwd Shall Prevail. All Dsr Items Should Be Read In Conjunction With The Latest Cpwd Specification. The Rates And Prices To Be Tendered In The Bill Of Quantities Of Schedule ‘A’, Schedule ‘B’, Schedule ‘C’, Schedule ‘D’ Are For Completed Works And Finished Items And Complete In All Respects & To Be Carried Out As Per The Description Of Items And Relevant Specifications. The Rates And Prices Are For Miscellaneous Civil Work And Complete In All Respect.It Will Be Deemed To Include Cost Of All Plants, Labour, Supervision, Materials, Scaffolding For Masonry Work & Any Work Etc., G.I. Binding Wire, All Lead & Lifts, Carriage, Transport, All Temporary Works, Erection, Maintenance, Utility Identification, Survey, All Other Works Mentioned In All Employer’S Requirements Including Appendices, Conditions Of Contract On Safety & Health And Environment, Contractor’S Profit And Establishment/Overheads, Together With Preparation Of Design And Drawings, All General Risks, Insurance Liabilities, Compliance Of Labour Laws And Obligations Set Out Or Implied In The Contract. For Taxes And Duties, Refer Clause 11.1.1 Of General Condition Of Contract (Dec 2025) And C2.6 Of Itt. If The Tenderer Fails To Quote Rates Against Any Item, The Tender Will Be Treated As Incomplete And Non-Responsive And Shall Be Rejected. All The Unit Rates And Amounts Should Be Filled In Figures Only. In Case Of Any Discrepancy Between Amount Quoted In Figures And In Words, The Amount In Figures Shall Be Treated As Sacrosanct. The Financial Package (Pricing Document) Must Be Uploaded By The Same Person Who Is Authorized As Per The Submitted Power Of Attorney (Poa) And Who Has Uploaded The Technical Package Using A Valid Class-Ii/Iii Digital Signature On Behalf Of The Tenderer. The Schedules Of Payment/Specified In Annexure-1 Of Schedule A & Annexure-2 Of Schedule B Are Purely For The Purpose Of Releasing ‘On Account Payments’ For The Work Executed Under The ‘Item Rate’ Component Of The Work. The Work Executed Against The Boq Items In Schedule C, D & E Would Be Paid On Measurement Basis. For The Purpose Of Payment: -A) In Schedule A, The Proportion Would Be Considered As Overall Percentage 100% I.E Quoted Lump Sum Price Of Schedule-A Has Been Divided In Three Heads. The Percentage Breakup Of Cost Component For Sub-Head A1 General Is 10% Of Lump Sum Quoted Price, Sub-Head A2 Main Building Is 75 % Of Lump Sum Quoted Price, Sub-Head A3 Residential Building Is 15 % Of Lump Sum Quoted Price.Total Cost Of Sub-Head “A1” (General) = 0.10 Of X Total Cost Sub-Head Of “A2 ” (Main Building - Block A) = 0.75 Of X Total Cost Of Sub-Head “A3 ” (Residential Building) = 0.15 Of Xx = Lump Sum Quoted Price Of \Sch-A\. The Rates And Prices Of The Tender Shall Be Inclusive Of Gst And All Applicable Taxes As On Last Date Of Tender Submission On E-Procurement Site. Further, For Taxes And Duties, Refer Clause 11.1.1 Of General Condition Of Contract And C2.6 Of Itt. The Contractor May Raise Their ‘On Account’ Payments On Monthly Basis As Per The Status Of Work On The Last Day Of The Respective Month. Variation (Applicable For Schedule ‘A’: Lump-Sum Portion Of The Works): In Case Of Variation In The Floor Area Of Any Building At Each Level On Either Side I.E. Increase Or Decrease With Respect To The Area Shown In The Tender Drawings, The Total Value Will Get Modified Accordingly On Prorata Basis Of Floor Area. For Example, If, Total Floor Area Xt As Per Tender Drawings And Xe Is The Total Floor Area Constructed Then The Revised Value Will Be A X (Xe/ Xt). Last date of submission for this tender is 2026-04-09. This is a Horticulture tender in Delhi, Delhi

Insurance Surety Bond

Fast, Reliable & Accepted for EMD/PBG

  • Zero BG Limit Impact
  • Accepted in All Tenders
  • Quick Online Quote

Tender Documents

  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
  • Tender Document 5xlsx
  • Tender Document 6pdf
  • Tender Document 7pdf
  • Tender Document 8pdf
  • Tender Document 9pdf
lock-red

Unlock the Tender details for free

description-svgrepo

Bidder Details

Bidder NameTechnical BidFinancial BidAOCBid ValueRank
Sharma infra projects pvt ltd
₹1,24,50,000.00L1
Verma constructions ltd
₹1,31,00,000.00L2
Nair engineering works
₹1,38,75,000.00L3
Iyer industrial solutions
₹1,43,20,000.00L4
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in