🎉 Your free trial plan has started. Plan will expire in 0 days

Steel Authority Of India Limited

durg, chhattisgarh

AOC value
₹1.88Cr
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Steel Authority Of India Limited has published Bids Are Invited For Custom Bid For Services - Repair, Maintenance, inspection & overhauling of various mechanical equipment’s in 4.0 MT area Section of Water Management Department. -MAJOR REPAIR OF PUMPS above 75KW CONTAINS FOLLOWING ACTIVITIES : 1. Ensure hydraulic isolation by opening drain plug. 2. Remove coupling guard and decouple pump with motor. 3. Dismantling the Pump:- a. Loosen and remove all the bolts of the top cover, then remove the top cover. b. Remove the bearing housing bolts. c. Take out the rotor assembly for dismantling. Meanwhile if the pump maintenance job would not get completed on the same day, put back the top cover and do required blanking so the there is no leakage from the pump body. 4. Dismantling of the rotor a) Shift rotor from pump house to store b) Remove flange coupling, use puller if necessary. c)Remove gland rope. d)Remove bearing housing covers. e)Remove Bearing Housings. f)Remove lantern rings. g)Remove gland boxes. h)Remove the gland bushes. i) Remove the sling rings. j)Remove conical Discs. k)Remove the impeller from the shaft. 5. Assembly of The Rotor a) Collect New/ refurbished shaft from store. b) Fabricate key for new shaft. c) Fix Impeller on the shaft by centering it wrt bearing seating. d) Fix Conical Disc. e) Fix New/ Refurbished Gland bushes. f) Fix Gland Check nuts. g) fix gland boxes. h) fix lantern Rings. i) Fix Sealing Rings. j) Fix Bearing Covers. k) Make Bearing seating and fix New Bearings. l) Grease the bearings & fix bearing housings. (Provide Spacers if Required.) m) Make Coupling Seating. n) Fabricate coupling key. o) Fix coupling. p) Shift rotor to pump house from store. 6) Fixing Of rotor. a) Open The Pump Top Cover by removing fixing bolts b) Lift the rotor by crane after proper slinging. c) Position the rotor on lower body. d) Align the conical disc sling rings and bearing housing wrt lower body. e) Fix the Rotor on lower body & tighten housing bolts. g) Check the freeness of the rotor and provide gland packings. h) Cut Top cover joint packing & place it on lower body. i) Place the top cover & tightened the joint bolts. j) Provide final round of gland packings and fix gland boxes. k) Tighten Gland box studs & do leakage testing by getting open suction valve. (Give Clearance of Motor Alignment) l) Make coupling bushes & coupling bolts ready. (m) Do Coupling After motor alignment & fix Coupling Guard. 2 4004297852 MAJOR REPAIR OF PUMPS below 75KW CONTAINS FOLLOWING ACTIVITIES: 1. Ensure hydraulic isolation by opening drain plug. 2. Remove coupling guard and decouple pump with motor. 3. Dismantling the Pump: a. Loosen and remove all the bolts of the top cover, then remove the top cover. b. Remove the bearing housing bolts. c. Take out the rotor assembly for dismantling. Meanwhile if the pump maintenance job would not get completed on the same day, put back the top cover and do required blanking so the there is no leakage from the pump body. 4. Dismantling of the rotor a) Shift rotor from pump house to store b) Remove flange coupling, use puller if necessary. c)Remove gland rope. d)Remove bearing housing covers. e)Remove Bearing Housings. f)Remove lantern rings. g)Remove gland boxes. h)Remove the gland bushes. i) Remove the sling rings. j) Remove conical Discs. k)Remove the impeller from the shaft. 5. Assembly of The Rotor a) Collect New/ refurbished shaft from store. b) Fabricate key for new shaft. c) Fix Impeller on the shaft by centering it wrt bearing seating. d) Fix Conical Disc. e) Fix New/ Refurbished Gland bushes. f) Fix Gland Check nuts. g) fix gland boxes. h) fix lantern Rings. i) Fix Sealing Rings. j) Fix Bearing Covers. k) Make Bearing seating and fix New Bearings. l) Grease the bearings & fix bearing housings. (Provide Spacers if Required.) m) Make Coupling Seating. n) Fabricate coupling key. o) Fix coupling. p) Shift rotor to pump house from store. 6) Fixing Of rotor. a) Open The Pump Top Cover by removing fixing bolts. b) Lift the rotor by crane after proper slinging. c) Position the rotor on lower body. d) Align the conical disc sling rings and bearing housing wrt lower body. e) Fix the Rotor on lower body & tighten housing bolts. g) Check the freeness of the rotor and provide gland packings. h) Cut Top cover joint packing & place it on lower body. i) Place the top cover & tightened the joint bolts. j) Provide final round of gland packings and fix gland boxes. k) Tighten Gland box studs & do leakage testing by getting open suction valve. (Give Clearance of Motor Alignment) l) Make coupling bushes & coupling bolts ready. (m) Do Coupling After motor alignment & fix Coupling Guard. 3 4004297851 GLAND & COUPLING BUSH CHANGING & BEARING GREASING OF PUMPS CONTAINS FOLLOWING ACTIVITIES: (A)Gland Addition. 1.Take Shutdown. 2.Get the Pump Hydraulically isolated by opening drain outs. 3.Remove Gland Stud nuts. 4.Remove Gland Boxes. 5.Remove old gland pickings. 6.Cut new gland pickings of proper sizes. 7.Insert gland packing turn by turn and press with gland box. 8.Fix the gland boxes & tighten Gland Stud nuts. 9.Close the Drain Outs. 10.Do Leakage testing. 11.Cancel Shut Down. (B)Bearing Greasing. 1.Take electrical Shut Down. 2.Remove bearing cover bolts & remove bearing covers. 3.Remove old dry grease of both of the bearings. 4.Feel the condition of the bearing cage & balls by hands. 5.If bearings are Ok. Apply fresh Grease. 6.Fix the bearing covers back & tighten cover Bolts. (C)Coupling Bushes & Bolts Inspection/ Changing. 1.Take Electrical Shutdown. 2.Remove coupling guards pedestal bolts. 3.Remove Coupling Guard. 4.Remove one bolt & rubber bush & see The Condition. 5.Fabricate rubber bushes as per dimension. 6.Replace old coupling bolts and bushes with new one. 7.Tighten coupling bolts. Fix coupling guard and fix pedestal bolts 4 4004294985 Overhauling of gate valve inside pump house by removing actuator, valve bonnet, replacement of defective spindle/ guide nut, cleaning/ lubrication as per scope of works detailed in tender document for valve size 200mm to 400mm. EA 96.00 3.417 5 4004296028 Overhauling of gate valve/ /Butterfly valves/Globe valve inside pump house by removing actuator, valve bonnet, replacement of defective spindle/ guide nut, cleaning/ lubrication as per scope of works detailed in tender document for valve size above 50 mm upto 200 mm EA 120.00 3.001 6 4004293794 Overhauling of gate valve inside pump house by removing actuator, valve bonnet, replacement of defective spindle/ guide nut, cleaning/ lubrication as per scope of works detailed in tender document for valve size 400mm to 600mm EA 72.00 2.357 7 4004293793 Overhauling of NRV/check valve inside pump house, tunnel & valve chamber by removing cover, spindle, flap, repair & refurbishing of damaged parts & assembly etc as per scope of works detailed in tender document for valve size 400mm to 600mm EA 48.00 1.761 8 4004295942 Overhauling of NRV/ check valve inside pump house, tunnel & valve chamber by removing cover, spindle, flap, repair & refurbishing of damaged parts & assembly etc as per scope of works detailed in tender document for valve size above 600 upto 1000 mm EA 24.00 1.466 9 4004297849 Inspection & Repair/maintenance of CTF contains following activities as mentioned in scope of work. EA 720.000 14.521 10 4004297847 Minor repair & patching of pipes inside pumphouses contains activities . Last date of submission for this tender is 2025-12-04. This is a Mechanical Engineering Service tender in Durg, Chhattisgarh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in