Rail Wheel Plant
Important Info
AOC Description
Rail Wheel Plant has published Supply Of switching over to piped natural gas set (png) from lpg at rwp/bela as per scope of work (annexure-a &b) to achieve heating cycle of hub cutting (3no.) + 2 items , design, supply, installation and commissioning of gas trains, valves , pipes and associated c omponents for switching over to piped natural gas set (png) from lpg at rwp/bela as per scope of work (a nnexure-a &b) to achieve heating cycle of hub cutting (3no.) [ warranty period: 12 months after the dat e of delivery ] ] , design, supply, installation and commissioning of gas trains, valves , pipes and associated c omponents for switching over to piped natural gas set (png) from lpg at rwp/bela as per scope of work (a nnexure-c) to achieve heating cycle of sand plant (sand coating & plant. [ warranty period: 12 months af ter the date of delivery ] ] , supply of all types of pipes, their support structure if laying through overhead structure and their fittings are in contractor scope. specification for pipes and fittings: - api 5l grade a or b carbon steel seamless pipe sch40 as per is: 1978 [ warranty period: 12 months after the date of delivery ] ]. Last date of submission for this tender is 2026-03-30. This is a Natural Gases tender in Bela, Bihar
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

