Eastern Railways

jamalpur, bihar

AOC value
₹12.24L
AOC date
11 Dec
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 11 Dec 24AOC date

Important info

Result ID
Refer Docs
Award of contract
11/12/2024
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Eastern Railways has published Supply Of Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Furnace No.-20Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Furnace No.-20,Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Fu Rnace No.-20 (Plant No- 10547) At Hts Shop Which Consists Of The Folowing:- 1 Supply, Installa Tion, Testing And Commissioning Of Heating Element Made Of Kanthal I.E Heat Resistance Allo Y Strip Formed Like Sine Curves Whose Total Load Of 200 Kw Is Divided Into Two Groups Such That Load Per Phase Per Group Is 33.3 Kw Approx. The Heating Element Should Be Suitable For Maximum Temperature 1100 Degree Celsius And Working Temperature 1000 Degree Celsius Of The Furnace. The Required Size Of Heating Element Alloy Strip Is 20 Mm (W) X 2.5Mm (T)/25 Mm( W) X 2.0 Mm(T). [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Various Grade Of Ceramic Fib Re Blankets For Overall Insulation Of The Furnace Whose Total Insulation Thickness Is 250 Mm. The Insulation Details Are As Follows : Rtz- 64 Kg/Cum- 75 Mm, Rtz- 96 Kg/Cum- 75 Mm, Htz- 296 Kg/Cum- 50 Mm, Htz- 128 Kg/Cum-50 Mm. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Insulator In The Furnace [ W Arranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Specially Made Silliminite Stri P Hanger For Hanging The Heating Element [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Silliminite Blanket Holder [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Indicating Lamps Of Control Panel, Selector Switches, Voltmeter, Ammeter Etc A S Per Requirement Of The Control Panel. Make- Selec/Havells Or Similar. [ Warranty Period: 3 0 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of. Last date of submission for this tender is 2024-10-14. This is a Switch Supply tender in jamalpur, Bihar

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in