Eastern Railways
- AOC value
- ₹2.53L
- AOC date
- 28 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 28 Apr 26AOC date
- -Published
- -Closes
- -Bid opens
- 28 Apr 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 28/04/2026
- Authority
- Eastern Railways
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Eastern Railways has published Supply Of Key For Link, Ky-36Key For Link, Ky-36,Key Set Consisting Of Sl. No:- (1) Key For Link, Ky-36 As Per Drg. No:- Jmp/Jj/Spl. 1A/2017 Item No-2 Alt-6 And Matl. Specn- Is:1875/92 Cl-Iv. Qty----36 Nos. Sl. No:- (2) Key For Screw Spindle, Ky-43 As Per J Mp Drg.No:-Jmp/Jj/Spl. 2/17 Item No-3 Alt-4 And Matl. Specn-As Mentioned In Drg. Qty.----18 Nos. Sl. No:- (3) Key For Large Sprocket, Ky-63 As Per Jmp Drg. No:- Jmp/Jj/Spl. 1A/2017 Item No-8 Alt-6 And Matl. Specn- Is:1 875/92 Cl-Iv. Qty.-18 Nos (One Set Consist Of Sl.No.1 To 3). [ Warranty Period: 30 Months After The Date O F Delivery ] ] , Top Bracket Cover, Wj-60 As Per Drg. No: - Jmp / Jj / Spl. 1A / 2017, Item No: - 6, Alt-6 [Mat. S Pecn.- As Per Drg.]. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Side Wheel, Wj-83/M, As Per Er/Jmp Drg. No. Wj-83/M, Alt-3, (Mat. Specn.- As Per Drg.). [ War Ranty Period: 30 Months After The Date Of Delivery ] ] , Rear Wheel, Wj-84/M, As Per Er/Jmp Drg. No.Wj-84/M, Alt-2, (Mat. Specn.- As Per Drg.). [ War Ranty Period: 30 Months After The Date Of Delivery ] ] , Top Bracket, Wj-7/M, As Per Drg. No. Wj-7/M, Alt-3 [Mat. Specn. As Mentioned In Drg.]. [ Warr Anty Period: 30 Months After The Date Of Delivery ] ] , Item Sl No. (1) Side Wheel Link (Rh), Wj-97/M, As Per Drg. No. Wj-97/M,Alt-2 Qty-------01 No. I Tem Sl No. (2) Side Wheel Link (Lh), Wj-98/M, As Per Drg. No. Wj-98/M Alt-2 Qty-------01 No. One Set Consist Of Item Sl No. 1 And 2. [Mat.Specn As Mentioned In Drg.] Make:-Indigenous. [ Warranty Period: 30 Month S After The Date Of Delivery ] ] Page 1 Of 6 Run Date/Time: 26/12/2025 10:15:26Jmp/Eastern Rly Tender Document , Sprocket Large, As Per Drg. No. Wj-24/M, Alt-D. [Mat. Specn.- As Per Drg.]. [ Warranty Peri Od: 30 Months After The Date Of Delivery ] ] , Sprocket Small, Wj-23/M As Per Sk.No.Jmp/Jack/03/2020 Alt-1, [Mat. Specn.- As Per Drg.] [ W Arranty Period: 30 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2026-01-14. This is a Railway Ancillaries tender in Jamalpur, Bihar
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free