East Central Railway
- AOC value
- ₹3.86Cr
- AOC date
- 28 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 28 Jan 25AOC date
- -Published
- -Closes
- -Bid opens
- 28 Jan 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 28/01/2025
- Authority
- East Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
East Central Railway has published Supply Of Scada Details As Per Demandscada Details As Per Demand,Design & Drawings For Installation Of Scada At Sp & Ssp. (As Per Para-1 Of Schedule-A A Ttached.) [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Testing & Commissioning Of Remote Station Equipment At Sp/Ssp As Per Rdso S Pecification No. Ti/Spc/Rcc/Scada/0133 Or Latest. ( As Per Para-2 Of Schedule-A Attached), [ Warrant Y Period: 30 Months After The Date Of Delivery ] ] , Erection Of Remote Station Equipment At Sp/Ssp As Per Rdso Specification No. Ti/Spc/R Cc/Scada/0133 Or Latest. ( As Per Para-2 Of Schedule-A Attached) [ Warranty Period: 30 Months Afte R The Date Of Delivery ] ] , Erection, Testing & Commissioning Of 2.5 Kva Dual Redundant Hot Stand By Ups System ( As Per Rdso Spec.- Ti/Spc/Rcc/Scada /0133) Or Latest. ( As Per Para-3 Of Schedule-A Attached ) [ Wa Rranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of Battery As Per Suitable Requirements. ( As Per Para-4 Of Schedule-A Attached) [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Erection Testing & Commissioning Of Battery As Per Suitable Requirement. ( As Per Para-5 Of Schedule-A Attached ) [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of Furniture At Rcc Danapur As Per Rdso Specification No. Ti/Spc /Rcc/Scada/0 130(Rev-2) With A & C Slip No. 1 To 3 Or Latest. ( As Per Para-6 Of Schedule-A Attached) [ Warranty Per Iod: 30 Months After The Date Of Delivery ] ] , Erection Of Furniture At Rcc Danapur As Per Rdso Specification No. Ti/Spc /Rcc/Scada/ 0130(Rev-2) With A & C Slip No. 1 To 3 Or Latest. ( As Per Para-7 Of Schedule-A Attached) [ Warranty P Eriod: 30 Months After The Date Of Delivery ] ] , Supply Erection Testing & Commissioning Of Communication Logistics (37 Sets; 36 Sets For Rtu , 1 Set For Rcc) As Per Rdso Specification. (A) Supply/Material. ( As Per Para-8 Of Schedule-A Attac Hed ) [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Erection. Last date of submission for this tender is 2024-10-21. This is a UPS tender in Danapur, Bihar
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free