East Central Railway
- AOC value
- ₹45.26K
- AOC date
- 31 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 31 Aug 26AOC date
- -Published
- -Closes
- -Bid opens
- 31 Aug 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 31/08/2026
- Authority
- East Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
East Central Railway has published Supply Of 1. parallelism checking tool 2. setting gauge for lhb control 3. fixture for lhb control arm , parallelism checking tool no. 12.841.0502 (control jig as per drg. no. 2841050270 with item no?s.: 1 to 9) for control arm of lhb coaches. firm should submit the tc & gc along with material. the item should be supplied with 3rd party calibration certificate from nabl approved lab. [ warranty period: 30 m onths after the date of delivery ] ] , setting gauge for lhb control arm bush assembly fixture as per icf drg no.j&t/f-0258/02 w ith calibration certificate. [ warranty period: 30 months after the date of delivery ] ] , fixture for lhb control arm assembly as per icf drg no.j&t/f- 0258/01 and drg no.j&t/f-025 8/03 (fixture include item 1 to item 8). [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-08-17. This is a Railway Ancillaries tender in null, Bihar
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free