East Central Railway
Important Info
AOC Description
East Central Railway has published Supply Of Supply , Installation & Commissioning Of Pressure Gauge Calibration Test Bench Along With Master Pressure Gauge 01 No & Accessories As Per Attached Specificationsupply , Installation & Commissioning Of Pressure Gauge Calibration Test Bench Along With Master Pressure Gauge 01 No & Accessories As Per Attached Specification,Supply , Installation & Commissioning Of Pressure Gauge Calibration Test Bench Along With Ma Ster Pressure Gauge 01 No & Accessories As Per Attached Specification. [ Warranty Period: 30 Months Afte R The Date Of Delivery ] ]. Last date of submission for this tender is 2026-02-19. This is a Pressure Gauge tender in Gaya, Bihar
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

