Numaligarh Refinery Limited
- AOC value
- ₹4.73Cr
- AOC date
- 8 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 8 Oct 25AOC date
- -Published
- -Closes
- -Bid opens
- 8 Oct 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 08/10/2025
- Authority
- Numaligarh Refinery Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Numaligarh Refinery Limited has published Supply Of Ac Ups Design, Engineering, Procurement, Fabrication, Inspection, Testing, Factory Acceptance Test (Fat), Packing, Transportation And Supply Of The Ac Ups To Be Installed At Numaligarh Refinery Limited (Nrl), Assam As Per Material Requisition , 2 X 200 Kva, 115V Ac, 50 Hz, Single Phase Parallel Redundant Ups With Bypass For Feeding Dcs And Non Dcs Loads. The Ups Shall Consist Of – • Ac Ups Panel • Fault Diagnostic Unit (Fdu) • Voltage Stabilizer In Bypass • Battery Rack / Stand • Double Pole Flame Proof Battery Isolator Switch / Breaker • Ac Distribution Board (Acdb) • Cell Booster Of Adequate Rating • All Associated Power / Communication Cables And All Other Scope As Defined In The Mr , Lumpsum Price For Nickel Cadmium (Ni-Cd) Battery - 2 X 100% , Scope As Per Material Requisition ( Mr) , Lumpsum Price For Mandatory Spares For For Boq Item No 1.0, Scope As Per Material Requisition ( Mr) , Lumpsum Price For Third Party Inspection Charges For Boq Item No 1.0 , Site Work,Detailedscope As Per Material Requisition ( Mr)- Lumpsum Price For Boq Item No 1.0 , Lumpsum Training Requirement For Two Numbers Of Owner’S Engineer At Manufacturing Works For Three Days For The Operation And Maintenance Of Ac Ups And Battery.For Boq Item No 1.0 , Lumpsum Training Chargesfor Two Numbers Of Owner’S Engineer At Site For One Week For The Operation And Maintenance Ac Ups And Battery For Boq Item No 1.0 , Transportation:For Boq Item No 1.0 For Indegenious Bidders : Inland Transportation Charges By Road Of All Supplies From Vendor’S Works / Shop To Project Site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation Up To Nmgs/Numaligarh Refinery Project Siding. , Lumpsum Cost Forextended Warranty For 24 Months After Commissioning Or 36 Months After Dispatch Whichever Is Earlier For Boq Item No 1.0 , 2 X 20 Kva, 115V Ac, 50 Hz, Single Phase Parallel Redundant Ups With Bypass For Feeding Dcs And Non Dcs Loads. The Ups Shall Consist Of – • Ac Ups Panel • Fault Diagnostic Unit (Fdu) • Voltage Stabilizer In Bypass • Battery Rack / Stand • Double Pole Flame Proof Battery Isolator Switch/ Breaker • Ac Distribution Board (Acdb) • Cell Booster Of Adequate Rating • All Associated Power / Communication Cables And All Other Scope As Defined In The Mr , Lumpsum Price For Nickel Cadmium (Ni-Cd) Battery - 2 X 100% , Scope As Per Material Requisition ( Mr) , Lumpsum Price For Mandatory Spares For For Boq Item No 2.0, Scope As Per Material Requisition ( Mr) , Lumpsum Price For Third Party Inspection Charges For For Boq Item No 2.0 , Site Work ,Detailedscope As Per Material Requisition ( Mr)- Lumpsum Price For Boq Item No 2.0 @ , Lumpsum Training Requirement For Two Numbers Of Owner’S Engineer At Manufacturing Works For Three Days For The Operation And Maintenance Of Ac Ups And Battery.For Boq Item No 2.0 , Lumpsum Training Chargesfor Two Numbers Of Owner’S Engineer At Site For One Week For The Operation And Maintenance Ac Ups And Battery For Boq Item No 2.0 , Transportation: Forfor Boq Item No 2.0 For Indegenious Bidders : Inland Transportation Charges By Road Of All Supplies From Vendor’S Works / Shop To Project Site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation Up To Nmgs/Numaligarh Refinery Project Siding. , Lumpsum Cost Forextended Warranty For 24 Months After Commissioning Or 36 Months After Dispatch Whichever Is Earlier For Boq Item No 2.0 , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testingas Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Per Diem Charges Upto 8 Hrs On Normal Working Days. ( Bidders To Quoteunit Rate For Diem Charges ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testingas Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour (Beyond Normal 8 Hours On Normal Working Days). ( Bidders To Quote Over Timerate Per Hour ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testingas Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour For Work On Weekly Off Days / Holidays (As Applicable To Refinery Site). ( Bidders To Quote Over Timerate Per Hour ). Last date of submission for this tender is 2024-09-19. This is a Distribution Board tender in Golaghat, Assam
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
6 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free