Numaligarh Refinery Limited
- AOC value
- ₹6.46Cr
- AOC date
- 10 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 10 Sep 25AOC date
- -Published
- -Closes
- -Bid opens
- 10 Sep 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 10/09/2025
- Authority
- Numaligarh Refinery Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Numaligarh Refinery Limited has published Distribution Transformer Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Distribution Transformer , Distribution Transformer (2.5 Mva, 6.6/0.433Kv, 50Hz ) Along With Condition Monitoring (Cm) And Asset Performance Management (Apm) System As Per Details Mentioned In Mr , Third Party Inspection Charges , Mandatory Spares Charges , Transportation: For Indegenious Bidders : Inland Transportation Charges By Road Of All Supplies From Vendor’S Works / Shop To Project Site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation Up To Nmgs/Numaligarh Refinery Project Siding. , Site Workas Per Sr No 5 Of Mr , Training Charges, As Per Scope Defined In Mr. , Extended Warranty For 24 Months After Commissioning Or 36 Months After Dispatch Whichever Is Earlier , Unit Rate For Supervision Sevices Of Erection And Commissioning / Performance Testing/ Periodic Visit Post Commisioning (Till Warranty Period) As Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Per Diem Charges Upto 8 Hrs On Normal Working Days. ( Bidders To Quoteunit Rate For Diem Charges ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testing / Periodic Visit Post Commisioning (Till Warranty Period) Asper Enclosed Instructions To Vendor Overtime Rate Per Hour (Beyond Normal 8 Hours On Normal Working Days). ( Bidders To Quote Over Timerate Per Hour ) , Unit Rate For Supervision Sevices Of Erection And Commissioning / Performance Testing / Periodic Visit Post Commisioning (Till Warranty Period) Asper Enclosed Instructions To Vendor Overtime Rate Per Hour For Work On Weekly Off Days / Holidays (As Applicable To Refinery Site). ( Bidders To Quote Over Timerate Per Hour ). Last date of submission for this tender is 2023-03-20. This is a Distribution Transformer tender in Golaghat, Assam
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
6 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free