🎉 Your free trial plan has started. Plan will expire in 0 days

Military Engineer Services

dinjan, assam

AOC value
₹45.08L
AOC date
25 Feb
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 25 Feb 21AOC date

Important info

Result ID
Refer Docs
Award of contract
25/02/2021
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Military Engineer Services has published Outsourcing Of Services And Operation For Maintenance Of E And M Installation Under Ge Dinjan Outsourcing Of Services And Operation For Maintenance Of E / M Installation Under Ge Dinjan , Outsourcing Of Services For Operation And Maint Of E&M Installation As Mentioned Below Continuously Round The Clock For Operating Incoming , Outgoing Feeders And Lt Panels Including Attending Of Emergency Break Down Round The Clock By Three Electrician ( Skilled ) For Operating Gods , Ht / Lt Overhead / Ug Distribution , Las And Other E / M Installation , Operation Consists Of Three Shift In Day ( Ie Each Shift Is Having 08 Hours Of Duration ) On All Working Days Including Sunday And Holidays Complete All As Specified And Directed . ( A ) . Operation And Maint Of Lt Panels Boards , Switchgears , Lt Terminal Connections As Directed By Engineers-In-Charge . ( B ) . If Load Shedding Is Required Based On Power Supply Interruption To Carry Our Any Repair / Maint Wk , Operate The Outgoing Gods , Switchgears Etc As Directed By The Engineer-In-Charge . ( C ) . In Case Of Break Down , Shut Down Or Tripping Of Switchgears , Line Patrolling , Fault Tracing And Rectifying , All As Specified And Directed By The Engineers-In-Charge . ( D ) . Operating Of Changeovers , Checkling Their Links And Rectifing Faulty Links / Terminals , Cable Connections Etc All As Specified And Directed By The Engineers-In-Charge . ( E ) . Cleaning The Lt Panels And Other Connected Switchgears , Surrounding By Cutting Grass , Green Vegigation And Keep Neat And Clean At Installation / Eqpts , Pole Structure All As Specified And Directed By The Engineers-In-Charge . ( F ) . Carry Out Daily Check Of Timers , Contactors Etc Their Amperage , Volts Etc Necessary Rectifications All As Specified And Directed By The Engineers-In-Charge . ( G ) . The Electricians Are To Covers Areas Of Dinjan Alongwith Outerpockets All As Specified And Directed By The Engineers-In-Charge . ( H ) . The Installation / Elect Distr Sys Will Have To Be Operated On All Working Days Including Saturday , Sundays And Holidays Alongwith Other Electrical Related Works Not Mentioned Above All As Specified And Directed By The Engineers-In-Charge As Per Work Urgency / Breakdown . , Outsourcing Of Services For Operation And Maint Of E&M Installation As Mentioned Below Continuously Round The Clock For Operating Incoming , Outgoing Feeders And Lt Panels Including Attending Of Emergency Break Down Round The Clock By Three Helper ( Un-Skilled ) For Assisting Electrician Against Sl Item No 01 In Operating Gods , Ht / Lt Overhead / Ug Distribution , Las And Other E / M Installation , Operation Consists Of Three Shift In Day ( Ie Each Shift Is Having 08 Hours Of Duration ) On All Working Days Including Sunday And Holidays Complete All As Specified And Directed . ( A ) . Operation And Maint Of Lt Panels Boards , Switchgears , Lt Terminal Connections As Directed By Engineers-In-Charge . ( B ) . If Load Shedding Is Required Based On Power Supply Interruption To Carry Our Any Repair / Maint Wk , Operate The Outgoing Gods , Switchgears Etc As Directed By The Engineer-In-Charge . ( C ) . In Case Of Break Down , Shut Down Or Tripping Of Switchgears , Line Patrolling , Fault Tracing And Rectifying , All As Specified And Directed By The Engineers-In-Charge . ( D ) . Operating Of Changeovers , Checkling Their Links And Rectifing Faulty Links / Terminals , Cable Connections Etc All As Specified And Directed By The Engineers-In-Charge . ( E ) . Cleaning The Lt Panels And Other Connected Switchgears , Surrounding By Cutting Grass , Green Vegigation And Keep Neat And Clean At Installation / Eqpts , Pole Structure All As Specified And Directed By The Engineers-In-Charge . ( F ) . Carry Out Daily Check Of Timers , Contactors Etc Their Amperage , Volts Etc Necessary Rectifications All As Specified And Directed By The Engineers-In-Charge . ( G ) . The Electricians Are To Covers Areas Of Dinjan Alongwith Outerpockets All As Specified And Directed By The Engineers-In-Charge . ( H ) . The Installation / Elect Distr Sys Will Have To Be Operated On All Working Days Including Saturday , Sundays And Holidays Alongwith Other Electrical Related Works Not Mentioned Above All As Specified And Directed By The Engineers-In-Charge As Per Work Urgency / Breakdown . , Note :- ( For Item No . 1 To 2 ) ( I ) It Is An Express Condition Of The Contract That Tenderers Are Required To Quote Their Rates Duly Considered Minimum Applicable As Per Policy Wages Of The Tradesmen Intended In The Tender , As In Force On The End Date Of Bid Submission . It Shall Be Deemed That Quoted Rates Are Based On Minimum Wages Notified By The Concerned Authority For The Station I . E Govt Of India / Assam Govt / Union Teritory , Whichever Is Higher Including All Statutory Provisions Such As Epf , Gst , Esic , Bonus , Labour Welfare Cess ( Lwc ) And Contractors Overhead & Profits Etc As Applicable . ( Ii ) In Case The Rates Quoted By Tenderer Are Less Than The Notified Minimum Wages As On Bid Submission End Date Including All Statutory Provisions Such As Epf , Gst , Esic , Bonus , Labour Welfare Cess ( Lwc ) And Contractors Overhead & Profits Etc As Applicable , His Tender Will Be Treated As Non-Bonafide And Will Not Be Considered For Acceptance . In Such Case , The Lowest Tender Shall Be Determined Amongst Valid / Bonafide Bids Only . ( Iii ) Tenderers Are Required To Quote Their Rates Upto Two Digits After Decimal Place Or Otherwise It Will Be Considered By Rounding Off To Two Digits After Decimal Place . ( Xiii ) Nil Or Zero Quoting Against Oh & Profit Will Be Rated As Non-Bonafide . ( Iv ) In Case Of Tie In Amount Between Two Or More Bidder Firms , The Preference Shall Be Given In Order Of Following Criterias :- ( A ) Class Of Contractor ( B ) Work Load Return ( C ) Financial Soundness ( As Per Solvency Certificate Issued By Bank ) ( D ) Contractor Will Also Provide Protective Mask And Sanitizer To Each Operator And Cost Of The Same Deemed To Be Included In The Quoted Rates . ( V ) Tenderer Must Visit All The Plants To Ascertain The Conditions Of The Plants As Well As To Ascertain The Exact Scope Of The Work With Prior Appointment Of Age E / M Dinjan Before Quoting Unit Rate And No Extra Claim What So Ever On This Account Will Be Entertained At A Later Date . ( Vi ) The Contractor Shall Be Responsible For Making Good Damage Occurred Due To In-Adequate Experience Of Staff Employed By Him And Or Negligence Of His Workman . ( Vii ) The Contractor Shall Be Responsible To Keep The Electric Supply Installation Neat And Clean On Every Day Including Cutting Of Grass Inside Fencing And Outside 3 Metre Around Fencing Of The Water Point . ( Viii ) The Contractor Shall Pay To His Workmen In Their Bank Account And Statement Of Bank Account Shall Be Submitted To Ge For His Verification While Claiming Interim Payment . ( Ix ) The Electrician / Mate Shall Be Minimum Eighteen Years Of Age At The Time Of Appointment . ( X ) The Minimum Qualification Of The Electrician Shall Be Matriculation ( 10Th Pass ) From A Recognised Board And Iti Passed Or Equivalent From A Recognized Iti / Ncvt In The Respective Trade .. Last date of submission for this tender is 2021-01-14. This is a Man Power Supply tender in Dinjan, Assam

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in