🎉 Your free trial plan has started. Plan will expire in 0 days

Brahmaputra Cracker And Polymer Limited

dibrugarh, assam

AOC value
₹58.93L
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Brahmaputra Cracker And Polymer Limited has published Bids Are invited for Custom Bid For Services - Hiring Of Contract Service For Short Shutdown Related Mechanical Activities Towards Opening Of Reactor And Hydrotesting Of Critical Exchange Of Lldpe/Hdpe Unit At Bcpl, Lepetkata - Short Text : Blinding & Deblinding: Hydrogen 1 #600 Long Text : Blinding & Deblinding Activity Of Hydrocarbon Feed Line For Hydrogen Service, Size 1#600 Of Reactor, Rb-400: Loosening Of Stud Bolts, Opening Of Flanges, Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind, Replacement Of Flange Gaskets, Box Up And Tightnening Of Stud Bolts Etc. , Short Text : Blinding & Deblinding: Pentane 2 #300 Long Text : Blinding & Deblinding Activity Of Hydrocarbon Feed Line, Pentane, Size 2 #300, Of Reactor,Rb-400: Loosening Of Stud Bolts, Opening Of Flanges<(>,<)> Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind<(>,<)> Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc. , Short Text : Blinding & Deblinding: Butene 4 #300 Long Text : Blinding & Deblinding Activity Of Hydrocarbon Feed Line, Butane, Size 4 #300, Of Reactor<(>,<)> Rb-400: Loosening Of Stud Bolts, Opening Of Flanges<(>,<)> Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind<(>,<)> Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc.# # , Short Text : Blinding & Deblinding: Ethylene 8 #600 Long Text : Blinding & Deblinding Activity Of Hydrocarbon Feed Line, Ethylene<(>,<)> Size 8 #600; Of Reactor, Rb-400: Loosening Of Stud Bolts<(>,<)> Opening Of Flanges,Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind,Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc.# # , Short Text : Blinding & Deblinding:Nitrogen 3#300 Long Text : Blinding & Deblinding Activity Of Hydrocarbon Feed Lines, Nitrogen,Size 3 #300; Of Reactor, Rb-400:Loosening Of Stud Bolts<(>,<)> Opening Of Flanges,Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind<(>,<)> Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc.# # , Short Text : Blinding & Deblinding: Silencer 6#300 Long Text : Blinding & Deblinding Activity Of Reactor Silencer Pipeline<(>,<)> Flange Size 6 #300 Of Reactor, Rb-400:Loosening Of Stud Bolts<(>,<)> Opening Of Flanges<(>,<)> Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind,Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc.# # , Short Text : Blinding & Deblinding:36#300 I/L & O/L Long Text : Blinding & Deblinding Activity Of Hydrocarbon Inlet & Outlet Lines Of Reactor, Rb-400, Size 36#300: Loosening Of Stud Bolts, Opening Of Flanges,Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind<(>,<)> Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc.# # , Short Text : Manhole Opening/Boxup: Flng Size24 #300 Long Text : Reactor Manhole Opening/Box Up, Size24#300: Loosening <(>&<)> Removal Of Stud Bolts,Opening Of Manhole (With Dead Weight) Flange ,Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc. (Provision Of Davit Arm Available)# Max. Weight 256Kg# # , Short Text : Manhole Opening/Boxup: Flng Size48#300 Long Text : Reactor Manhole Opening/Box Up, Size 48#300 Class: Loosening <(>&<)> Removal Of Stud Bolts,Opening Of Manhole (With Dead Weight) Flange ,Replacement Of Flange Gaskets, Box Up And Tightening Of Stud Bolts Etc. (Provision Of Davit Arm Available) Max. Weight 127Kg## # , Short Text : Dropping/Boxup,Liquid Injection Nozzle Long Text : Reactor Liquid Injection Nozzle Dropping/Box Up<(>,<)> Size 4 #300: & 6#300 Loosening & Removal Of Stud Bolts<(>,<)> Dropping Of Component<(> ,<)> Replacement Of Flange Gaskets, Lifting And Positioning Of The Components After Cleaning, Box Up <(>&<)> Tightening Of Stud Bolts Etc. Equipment Weight 430Kg# # , Short Text : Dropping/Boxup,Catalyst Injection Nozzle Long Text : Reactor Catalyst Injection Nozzle Dropping/Box Up, 4 #300: Loosening <(>&<)> Removal Of Stud Bolts<(>,<)> Dropping Of Component<(>,<)> Replacement Of Flange Gaskets, Lifting And Positioning Of The Components After Cleaning, Box Up <(>&<)> Tightening Of Stud Bolts Etc. Equipment Weight 53Kg # # , Short Text : Dropping/Boxup,Teal Lg Injection Nozzle Long Text : Reactor Loop Gas Plus Teal Injection Nozzle Dropping/Box Up, 10 #300: Loosening <(>&<)> Removal Of Stud Bolts,Dropping Of Component<(> ,<)> Replacement Of Flange Gaskets, Lifting And Positioning Of The Components After Cleaning, Box Up <(>&<)> Tightening Of Stud Bolts Etc.# # , Short Text : Dropping/Boxup,Dmw Injection Nozzle Long Text : Reactor Dm Water Injection Nozzle Dropping/Box Up, 0.5 #300: Loosening <(>&<)> Removal Of Stud Bolts<(>,<)> Dropping Of Component<(>,<)> Replacement Of Flange Gaskets, Lifting And Positioning Of The Components After Cleaning, Box Up <(>&<)> Tightening Of Stud Bolts Etc.# # , Short Text : Dismantling/Boxup Of Reactor Gas Cyclone Long Text : Reactor Gas Cyclone<(>,<)> 117-Gj-400A/B Opening/Boxup Flange Id 850Mm Equipment Weight 3.6 Ton Loosening <(>&<)> Removal Of Stud Bolts ,Dismantling Of Cone Portion From Hinged Joint, Replacement Of Flange Gaskets, Lifting And Positioning Of The Components After Cleaning, Box Up <(>&<)> Tightening Of Stud Bolts Etc.# # , Short Text : Dropping/Boxup,Reactor Fines Ejectors Long Text : Reactor Fines Ejector,117-Ja-400A/B Dropping/Box Up Equipment Weight 776 Kg.Nozzle List: A. Size: 6300#, Tightening Torque 160 N.M B. 4 1500#,Tightening Torque 500N.M C. 6 1500#<(>,<)> Tightening Torque 770N.M Loosening & Removal Of Stud Bolts, Dropping Ofcomponent, Replacementof Flange Gaskets,Lifting And Positioning Of The Components After Cleaning, Box Up <(>&<)> Tightening Of Stud Bolts Etc.# # , Short Text : Hydrotest Of Exchanger, 117-Ee-400 Long Text : Hydrotest Of Exchanger<(>,<)> 117-Ee-400, Dome Dropping, Size/Weight: Inlet Dome 2052Mm/1572Kg, Outlet Dome 2052Mm/1728Kg<(>,<)> Blinding Of Shell Side Dm Water Inlet/Outlet Line 24#300, Tube Sheet Drying, Hydro Testing, Deblinding Of Shell Side Dm Water Inlet/Outlet Lines 24 #300, Cleaning Of Rust/Debris From The Flange Face, And Final Box Up Of Main Loop Condenser (117-Ee-400)# , Short Text : Hydrotest Of Exchanger, 117-Ee-403 Long Text : Hydrotest Of Exchanger,117-Ee-403 Long Description: Dome Dropping, Size: Inlet Dome 459Mm, Outlet Dome 459Mm, Blinding Of Shell Side Cooling Water Inlet/Outlet Line 4#300, Tube Sheet Drying, Hydro Testing,Deblinding Of Shell Side Cooling Water Inlet/Outlet Lines 4#300, Cleaning Of Rust/Debris From The Flange Face, And Final Box Up Of Ka-401 Discharge Cooler(117-Ee-403)# # , Short Text : Hydrotest Of Exchanger, 117-Ee-409 Long Text : Dome Dropping, Blinding Of Channel Side Inlet/Outler Lines 8#600 And Shell Side Cooling Water Inlet/Outlet Line 10#300, Tube Sheet Drying, Hydro Testing, Deblinding Of Shell Side Cooling Water Inlet/Outlet Lines 8 #300 And Final Box Up Of Pa-409 Discharge Cooler (117-Ee-409) , Short Text : Hydrotest Of Exchanger, 117-Ee-470 Long Text : Dome Dropping, Blinding Of Shell Side Cooling Water Inlet/Outlet Line 3#150, Tube Sheet Drying, Hydro Testing, Deblinding Of Shell Side Cooling Water Inlet/Outlet Lines 3 #150 And Final Box Up. , Short Text : Hydrotest Of Exchanger, 117-Ee-480 Long Text : Dome Dropping, Blinding Of Shell Side Cooling Water Inlet/Outlet Line 3#150, Tube Sheet Drying, Hydro Testing, Deblinding Of Shell Side Cooling Water Inlet/Outlet Lines 3 #150 And Final Box Up. , Short Text : Hydrotest Of Exchanger, 117-Ee-472 Long Text : Channel Inlet/Outlet Cooling Water Line Opening (6 # 150), Dome Dropping, Blinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 8#150, Tube Sheet Drying, Hydro Testing Of Channel Side After Dome Boxup With New Gasket & Blinding Of Cooling Water Inlet/Outlet Line (6#150) Or Pneumatic Test Of Shell Side After Installation Of Test Flange, Deblinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 8#150 And Final Box Up Of Ka-470 1St Stage Cooler (117-Ee-472) With New Set Of Gaskets. , Short Text : Hydrotest Of Exchanger, 117-Ee-473 Long Text : Channel Inlet/Outlet Cooling Water Line Opening (6 # 300), Dome Dropping, Blinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 6#300 & 4#300, Tube Sheet Drying, Hydro Testing Of Channel Side After Dome Boxup With New Gasket & Blinding Of Cooling Water Inlet/Outlet Line (6#300) Or Pneumatic Test Of Shell Side After Installation Of Test Flange, Deblinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 6#300 & 4#300 And Final Box Up Of Ka-470 Discharge Cooler (117-Ee-473) With New Set Of Gaskets , Short Text : Hydrotest Of Exchanger, 117-Ee-482 Long Text : Channel Inlet/Outlet Cooling Water Line Opening (4 # 150), Dome Dropping, Blinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 6#150, Tube Sheet Drying, Hydro Testing Of Channel Side After Dome Boxup With New Gasket & Blinding Of Cooling Water Inlet/Outlet Line (4#150) Or Pneumatic Test Of Shell Side After Installation Of Test Flange, Deblinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 6#150 And Final Box Up Of Ka-480 1St Stage Cooler (117-Ee-482) With New Set Of Gaskets , Short Text : Hydrotest Of Exchanger, 117-Ee-483 Long Text : Channel Inlet/Outlet Cooling Water Line Opening (4 # 150), Dome Dropping, Blinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 6#150, Tube Sheet Drying, Hydro Testing Of Channel Side After Dome Boxup With New Gasket & Blinding Of Cooling Water Inlet/Outlet Line (4#150) Or Pneumatic Test Of Shell Side After Installation Of Test Flange, Deblinding Of Shell Side Process Gas (Hydrocarbon) Inlet/Outlet Line 6#150 And Final Box Up Of Ka-480 Discharge Cooler (117-Ee-483) With New Set Of Gaskets. Last date of submission for this tender is 2026-06-29. This is a Mechanical Engineering Service tender in Dibrugarh, Assam

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in