🎉 Your free trial plan has started. Plan will expire in 0 days

Military Engineer Services

garrison engineer utility-i visakhapatnam, andhra pradesh

AOC value
₹28.07L
AOC date
6 Jun
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 6 Jun 20AOC date

Important info

Result ID
Refer Docs
Award of contract
06/06/2020
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Military Engineer Services has published Repair/Maint Of 33/11 Kv Mrs Yard , Power Transformers , Ht Vcb Panels , Distribution Transformers , Ht Rmus , Ht Ug Cables Including Servicing And Calibration Of Relays At Dolphin Hills And Other Allied Areas Under Age E/M No I Of Ge ( U-I ) , Visakhapatnam , M & L For Disconnecting Carefully Electrical Connection From Both Ht/Lt ( Primary & Secondary ) Sides Of The Transformer , Keeping Them At Safe Side , Draining The Transformer Oil To 3/4Th Level In Clean Container For Re-Use , Opening Top Cover Of The Transformer By Unscrewing Nuts , Bolts , Washers Etc , Thorough Inspection Of Bushings , Windings , Providing Insulations To Leads And Terminals , Refixing The Top Cover Incl Replacement Of Corck Sheet/ Gasket 8Mm Thick , Tightening Of Nuts /Bolts /Washers Etc And Replacement Of Breather With Silica Gel Crystal Type , Replacement Of Defective Bushing Rods/Bushes/ O Rings ( Oil Seals ) , Refilling The Transformer Oil , Improving Insulation Values By Dehydration Of Transformer Oil Of Transformers To Achieve Di-Electric Strength Not Less Than 60 Kv At 2 . 5Mm Gap As Per Relevant Is With Suitable Portable Filtration Plant , Connecting Ht/Lt Cables , Testing & Commissioning Complete Of Following Capacity Transformers :- , 2500 Kva / 3150 Kva , 33Kv / 11 Kv , Step Down , 5000 Kva , 33Kv / 11 Kv , Step Down , Note: ( A ) The Inspection Of Transformer Shall Involve:-I ) Checking Of All Clamps , Nuts , Bolts Including Core Bolts & Cover Fixing Bolts . Ii ) Checking All Brazings , Joints , Tap Heads And Connection Joints . Iii ) Checking All Jumpers , Terminations/ Connections Inside The Transformer . Iv ) Checking The Buckholz Relay , Conservator Mog . V ) Arresting Leakages Of Radiator Assembly By Brazing . Vi ) Arresting Wetting At Interconnections By Replacements Of O Rings Etc Complete . Vii ) Painting Of Transformer Complete With Two Coats Of Synthetic Enamel Paint Externally Complete All As Directed By Engr-In-Charge . Viii ) Conducting The Tests On Core And Windings As Per Is Like Ratio , Magentic Imbalance , Short Circuit Etc In Presence Of Engr-In-Charge And Test Results Shall Be Signed Both By The Contractor And Engineer -In-Charge And Kept On Record . , ( B ) Any Damage To Insulators/Bushes/Windings Etc While In The Custody Of The Contractor Shall Be Made Good At No Extra Cost To Govt . The Serviceability Of The Transformer Shall Be Checked And Confirmed By The Contractor Before Taking Into His Custody . ( C ) The M/L For Bushes , Studs , Transformer Oil , Filtration Of Oil , Cable Box , Replacement Of Major Spares , Repair/Servicing Of Oltc Etc Will Be Measured And Paid Separately . , M&L For Overhauling Of Oltc Of 33/11 Kv Transformer Of Following Capacity By Draining Out Of Transformer Oil Of Oltc , Dismantling Of Top Cover , Inspection Of Moving And Fixed Contacts Of All Three Phases And Checking The Operation , Cleaning And Removal Of Contacts Of All The Three Phases And Checking The Operation , Cleaning And Removal Of All Carbon Particles , Cleaning Of Contacts With Emery Paper , Checking The Tightness Of Leads In The Oltc Board , And Moving/Fixed Contacts . Inspection Of Transition Resistance And Replacement Of Gaskets / Contacts Etc If Found Damaged , Reassembling Complete , Filling Up Of Oil , Testing And Commissioning Complete All As Directed By Engr-In-Charge . , A ) 2500 Kva / 3150/5000 Kva , 33Kv / 11 Kv , Step Down , M&L For Replacement Of Radiator Drain Valves For 2500/3150/5000 Kva 33/11 Kv Transformers Including Dismantling Old One . , M&L For Replacement Of The Ht Porcelain Bushings Complete Of Following Capacity Transformers Of Any Make/Size/Type All As Directed Including Dismantling Old One . , ( A ) 2500/3150 Kva , 33/11 Kv , ( B ) 5000 Kva , 33/11 Kv , M&L For Replacement Of The Ht Bushing Rod Made Out Of Gun Metal With Threading & Suitable Length/Size All As Per Existing Including Metal Rings/Bolts/Washers/Rubber Rings Etc Complete Of Following Capacity Transformers Of Any Make/Size/Type All As Directed Including Dismantling Old One . , ( A ) 2500/3150 Kva , 33/11 Kv , ( B ) 5000 Kva , 33/11 Kv , M/L For Replacement Of Winding Temperature Indicator ( Wti ) Of 33/11 Kv Transformers Of Capacity 2500 To 5000 Kva Including Dismantling Old One . , M/L For Replacement Of Oil Temperature Indicator ( Oti ) Of 33/11 Kv Transformers Of Capacity 2500 To 5000 Kva Including Dismantling Old One . , M&L For Disconnecting Carefully Electrical Connection From Both Ht/ Lt ( Primary & Secondary ) Sides Of The Transformer , Keeping Them At Safe Side And Taking Out The The Transformer Indoor/ Outdoor Type Of Capacity From 63 Kva To 750 Kva , 11 Kv/ 0 . 433 Kv , Step Down Any Make For Carrying Out Refixing After Completion Of Minor Repairs Like Maintenance / Replacement Of Ht/Lt Bush , Metal Rods , Lugs , Replacement Of Rusted Nutbolts Etc Including Cheking The Continuty Of Ht/Lt Windings , Top Cover Opening , Prevent The All Oil Leakages , Provn Of New Insulated Gaskets / Cork Sheet For Ht/Lt Supply Etc Complete All As Specefied And Directed . Note: Porcelain Bushings , Gun Metal Rods , Cable End Joint Kit , Transformer Oil Etc To Be Measured And Paid Separatly Under Respective Schedules . , M&L For Disconnecting Carefully Electrical Connection From Both Ht/ Lt ( Primary & Secondary ) Sides Of The Transformer , Keeping Them At Safe Side And Taking Out The Transformer Indoor/ Outdoor Type Of Capacity From 401 Kva To 750 Kva , 11 Kv/ 0 . 433 Kv , Step Down Any Make For Carrying Out Complete Overhauling Which Shall Comprise Of The Following Includinguding Handling , Lifting , Transportation To And From Complete :- , A ) Opening Top Cover Of The Transformer By Unscrewing Nuts , Bolts , Washers Etc . Including Disconnecting Core Assembly From Ht/ Lt Bushing And Lifting The Same Gently And Taking Out From The Shell ( Container/ Body ) Of The Transformer . , B ) M&L For Draining Out Transformer Oil From The Above Said Transformer In The Suitable Capacity Of Container /Drums And Keeping It In Safe Custody For Reuse . , C ) M&L For Cleaning The Transformer Body From Inside , Removing Deposited Dirt/ Sludge/ Foreign Particles Etc . From The Bottom/ Body Of The Transformer And Drying Up The Shell From Inside Before Refilling Of The Transformer Oil . , D ) M&L For Cleaning And Washing Thoroughly Core And Windings Of The Transformer By Hosing Down With Clean Dry Oil , Removing Deposited Dirt/Sludge/Foreign Particles From The Windings/ Core , Thorough Inspection Of Windings , Providing Insulations To Leads And Terminals , Heating/ Drying/ Baking Complete Carefully And Thoroughly Inside The Heating Chamber At Suitable Temperature To Obtain Required Value Of Insulation Resistance Etc . All As Directed By Engr-In- Charge . , E ) Lifting And Refixing Core Assembly Inside The Transformer Shell Gently And Carefully , Connecting Primary/ Secondary/ Neutral Connections To The Bushings Assembly , Fixing Of Tap Change Over Including Tightening Of Nuts , Bolts , Washers Of The Core To Reduce Humming Noise All As Directed . , F ) Refilling The Filtered Transformer Oil In The Shell Of Transformer Complete . , G ) Refixing The Top Cover Including Replacement Of Cork Sheet/ Gasket , Tightening Of Nuts/ Bolts/ Washers Etc . And Replacement Of Breather With Silica Gel Crystal Type All As Directed By Engr-In Charge , H ) Lifting/ Handling From Where Removed And Re-Installing The Transformer Including Connecting Primary/ Secondary/ Neutral Connections Etc . All As Directed By Engr-In-Charge . , Note: ( I ) Any Damage To Insulators/ Bushes/ Windings Etc . While In The Custody Of The Contractor Shall Be Made Good At No Extra Cost To Department . The Serviceability Of The Transformer Shall Be Checked And Confirmed By The Contractor Befor. Last date of submission for this tender is 2020-05-16. This is a Transformer Repair tender in Garrison Engineer Utility-i Visakhapatnam, Andhra Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in