🎉 Your free trial plan has started. Plan will expire in 0 days

Archaeological Survey Of India

sidhout, andhra pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Archaeological Survey Of India has published Tender For Supply Of Materials - Srp To Fort With Ancient Buildings Enclosed Therein, Sidhout, Ysr Kadapa District, A.P.--- 1 Cost and supply of good quality Un-slaked/Kankar lime packed in air tight bags including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 2 Cost and Supply of Brick Surkhi free from organic impurities grit and silt including loading, unloading, transportation and neatly stacking at the site complete as directed by the site in-charge of work. 3 Cost and Supply of good quality River sand free from organic impurities grit and silt including loading unloading, transportation and neatly stacking at site etc. complete as directed by the site in-charge of work 4 Cost and Supply of good quality 40 mm brick aggregate including loading, unloading, transportation and neatly stacking at the site etc., complete as directed by the site in-charge of work. 5 Cost and supply of RR stones of size not less than 0.30x0.30x0.30m for footings including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work 6 Cost and supply of RR stones of size not less than 0.30x0.20x0.20m for gravity retaining wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work 7 Cost and supply of Cyclopean stones of size not less than 0.30 to 0.40m length 0.30 t0 0.45 m height and 0.60 to 0.80m width for fortification wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work 8 Cost and supply of Gravel including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 9 Cost and supply of RR stones of size not less than 0.20x0.20x0.15m for gravity retaining wall including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 10 Cost and supply of Mud Mortar including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 11 Cost and supply of Digging bar/ Crowbars of 6 feet length 32mm dia including loading, unloading, transportation and stacking charges etc. complete as directed by the site in charge of work. 12 Cost and supply of Spades with handle including loading, unloading, transportation etc., complete as directed by the site in charge of work. 13 Cost and supply of Plastic mortar pans including loading, unloading, transportation etc., complete as directed by the site in charge of work. 14 Cost and supply of Manila rope bundles of 2 inch dia (10 meters length each) including loading, unloading, transportation etc., complete as directed by the site in charge of work. 15 Cost and supply of Casurina ballies of 3” to 4” dia with 12 to 15 feet length including loading, unloading, transportation etc. complete as directed by the site in charge of work. 16 Cost and supply of Casurina ballies of 2” to 3” dia with 12 to 15 feet length including loading, unloading, transportation and fixing in the position etc. complete as directed by the site in charge of work. 17 Cost and supply of single wheel Wheel barrows(Iron) for carrying materials including loading, unloading, transportation etc. complete as directed by the site in charge of work. 18 Cost and supply of Hammer with handle (500Grams) including loading, unloading, transportation etc. complete as directed by the site in charge of work. 19 Cost and supply of Chisels -0.30mtr with 32mm dia including loading, unloading, transportation etc. complete as directed by the site in charge of work. 20 Cost and supply of Tamper with handle of size 0.20x0.20x1.23mtr including loading, unloading, transportation etc. complete as directed by the site in charge of work. 21 Cost and supply of Rubber boots including loading, unloading, transportation etc. complete as directed by the site in charge of work. 22 Cost and supply of Safety belt including loading, unloading, transportation etc. complete as directed by the site in charge of work. 23 Cost and supply of Hand gloves including loading, unloading, transportation etc. complete as directed by the site in charge of work. 24 Cost and supply of Safety helmets including loading, unloading, transportation etc. complete as directed by the site in charge of work. 25 Cost and supply of Plastic pots including loading, unloading, transportation etc. complete as directed by the site in charge of work. 26 Cost and supply of Empty water drums with capacity of 200 litre including loading, unloading, transportation etc. complete as directed by the site in charge of work. 27 Cost and supply of Wire rope with 12mm dia including loading, unloading, transportation and etc. complete as directed by the site in charge of work. 28 Cost and supply of Wire rope clamps including loading, unloading, transportation etc. complete as directed by the site in charge of work. 29 Cost and supply of Coir string including loading, unloading, transportation etc. complete as directed by the site in charge of work. 30 Cost and supply of ¾ “ Tata chisel rods- 0.15 to 0.20 mtr with 32mm dia including loading, unloading, transportation etc. complete as directed by the site in charge of work. 31 Cost and supply of 100 mm dia stone cutting blades (ISI Brand) including loading, unloading, transportation etc. complete as directed by the site in charge of work. 32 Cost and supply of Charcoalincluding loading, unloading, transportation etc. complete as directed by the site in charge of work 33 Cost and supply of Paint-3Ltrs & brushes- 5No.sto the site etc. complete as directed by the site in charge of work 34 Cost and supply of Dual power Lime grinder machine with followingSpecifications : Gear box type, 10HP Diesel engine and Electrical motor, 980 rpm, roller speed-25 rpm, grinding tub diameter 4to 5, Output-100 Cubic feet per hour, tub cast iron with marble, Grinding stone roller of weight about 200kgs including loading, unloading transportation etc., complete and as directed by the site in-charge. . Last date of submission for this tender is 2023-05-15. This is a Construction Material tender in Sidhout, Andhra Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1pdf
  • Tender Document 2pdf
  • Tender Document 3html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in