🎉 Your free trial plan has started. Plan will expire in 0 days

Indian Coast Guard

andaman, andaman and nicobar islands

AOC value
₹20.71L
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Indian Coast Guard has published Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1001 Hoist the boat making sure that bearing surfaces are adequately cushioned Docking duration 07 days; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1002 Clean the marine growth with wooden scrapper; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1003 Wash the underwater area with fresh water rub with grade 220 emery papers and smoothen the surfaces; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1004 Clean with mild detergent in fresh water Inspect for cracks and peeling of gel coat Repair if necessary; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1005 Touch up the antifouling paint as per paint scheme Paint Yard Supply; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1006 Clean all sea suction scoops and inspect for cracks; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1007 Clean the marine growth of shaft Propeller and Rudder; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1008 Measure and record the clearance of stern tube and P bracket bushes Rudder and Rudder jumping collar; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1009 Overhauling and pressure testing of the underwater valves and cocks including painting of valvesall material and spares yard supply i GS Pump Underwat.. , Repair Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1010 Clean the bilges and thoroughly inspect the structure to Main engine foundation Supports for distortion cracks and delamination; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1011 Check the tightness of foundation bolts of all auxiliary machineries; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HA1012 Marine Toilet Remove and clean all flexible pipes and refit with new clipsHand pumpsuction and discharge valve to be overhauledMake JABSCOModelCMPCT 24vDia.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WK507; HB1013 Dfender Crack and deterioration observed at Dfenders at various places to be renewed as per sampleLegth approx10 MtrEBD type rubber fender 75x75x40 mm; Se.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB1014 Cleaning and painting of bilges of following compartment to be carried out as per paint schemePaint yard supply i Engine Room 148 Sqm Approx ii Pum.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB 1015 Wheel House sofa Rexine is deteriorated and tear off at various places to be renewed as per samplelength 03 mtr height and breadth 05 mtr each; Service Pr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB 1016 Wheel House Sofa and sitting area seat cover to be changed as per sample Length03 mtrheight and breadth 05 mtr eachQty02; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB 1017 Wheel House Sofa and sitting area Floor Mat is damaged To be renewed as per sample Area 12 SQm Mat PVC VINYL; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB1018 Wheel House Wash Basin Tap leaking drain pipe choked pipe to be chemically clean and tap to be reneweddia of pipe40mmMaterial MS Tap materialSS; Service Pr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB1019 Wheel House rear window sun light protection film shading screen tear off at amny places to be replaced as per sample Area20 Sqm; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB1020 A wooden locker at crew cabin broken Hinges securing holes inlarge Locker to be repaired and sunmica sheet to be renewed Size1mtrx1mtrx05 mtr; Service Prov.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB1021 Ingress of rain water observed in bridge Crew cabin Engine room and pump room through window beeding Wire gland and securing bolt of stanchion Beeding to b.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; HB1022 Anchor and chain cable to be chip and clean and paint with two coats of anti corosive paint Make SEA Links Weight50 Kg Cable Length10 Mtr Dia10mm Paint and.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3001 Gear oil cooler to be chemically claeneed and pressure tested In way job include renewal of gasketO rings and 02 nos sacrificial anode TP 15 barQty02; Serv.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3002 AC sea water pump to be overhauled and proved for satisfactory operation Jobs include renewal of bearings Mechanicalseal and impeller MakeCrompton Greaves .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3003 Checks all cooling coils for cleaniness and corrosion If the coils are dirty Clean with water sparay Soap solution and nylon brush and carryout pressure te.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3004 Fire Fighting system ModelNOVEC 1230 Following jobs to be undertaken in yearly routine a Check Manual operation b Calibrate all pressure device .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3005 Following sewa water syatem valve to be removed overhaulked and pressure tested All material and spares Yard supply a Bilge syatem valve 40 NB TypeSDN.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3006 Fresh water tank to be cleaned with liquid detergent Renew Man hole cover gasket; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3007 Fuel Oil tank to be cleaned inspect and paint the as per paint scheme Paint Yard Supply Renew Manhole Cover gasket; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3008 Fire Pump ot be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EA3009 Bilge pump to be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EB3010 Fresh water pump is not developing sufficient pressure Suspect excessive clearence between pump and impeller Pump to be overhauled and proved for satsifac.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EB3011 Quick Shutt off valve cover of firemain syatem broken to be fabricated as per sample Material FRP Sheet Saize04x08x12 inches; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EB3012 Securing Clamps of Sw Fw and fuel syatem coroded and deteriorated to be renewed as per sample a Dia12 inches Qty06 MaterialSS b Dia10 inches Qty06.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; EB3013 04 nos gland bush stud of port and stbd shafting thread wornout Stud to be fabricated and fitted as per sample Dia14 mm Length72 mm MaterailSS; Service Pro.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; LA5001 Engine Room supply fans with motors 02 Nos to be overhaul and bearings to be replace Make CEM Model VE35230M; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; LA5002 05 in no Battery Charger to be overhauled and proved for satisfactory operation all spares and material yard supply MakeVICTRON ENERGY ModelBLUE SMART IP67.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WB507; LA5003 Window Wiper Overhaul the window wiper motor and gear assembly Replace bearings if required Wiper blade to be changed as per sample All spares and materia.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments Total Quantity :. Last date of submission for this tender is 2025-02-08. This is a Lifting Equipment tender in Andaman, Andaman And Nicobar Islands

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in